Capacity Requirements Planning (CRP) and Work Center Scheduling Features and Functions
|
- User-defined parameters for CRP runs
- Calculates CRP by contract or project
- Determines CRP by department, based on orders
- Infinite capacity loading and forward scheduling logic
- Finite capacity loading and backward scheduling logic
- Capacity calculations for machine and labor hours include future changes
- Cellular manufacturing calculations
- Maintains loads prior to manufacturing horizon
- Load requirements can be viewed by order and operation, in real time
- Customized views of order loads (planned, allocated, or released)
- User-defined load reporting and inquiry periods
- Released and planned orders and repetitive schedules are used to recalculate loads via back scheduling
- Work center load requirements displayed graphically
- Loads displayed by order type
- Capacity-load ratios for labor, machine, or set up
- Available hours or percent capacity display
- Cumulative available hours or percent capacity display
- Work center, department, and plant summaries
- Production requirements segmented into planned, firm planned, and released order categories
- Pegs calculated load
- Records partially completed items
- Creates load level what-if scenarios to measure load impact on production
- Creates load to capacity what-if scenarios
- Customizable planning periods and horizons
- Manufacturing calendar can be overridden for specific load centers
- More than one machine can be grouped and defined as a work center
- Work center load hours calculated for orders in progress
- Load hours are scheduled at a work center based on impending work/orders status
- Determines load capacities by machine utilization and labor efficiency
- User-defined CRP report horizons
- Uses order released rules to create due dates for unreleased orders
- Time period is used to calculate work center capacities
- Calculates date effectivity
- Work center resources can be included in CRP calculations
- Creates a resource profile with revision tracking
- Resources by work center or group
- Load reporting and inquiry (detailed and summary)
- Detailed load inquiries by planned, allocated, and released work orders
- Drill-down inquiries on load, by work center and time period
- Generates and summarizes horizontal reports on work center loads
- Generates detailed vertical reports on work center loads
- Work center data reports
- Generates reports on CRP batch options and parameters
- CRP report
- Generates summary or detail reports
- Generates detailed reports on load inquiries
- Generates reports on planned incoming orders and actual output of a work center
- Work center parameters can be set online
- Work center schedules include detailed load center sequencing and descriptions
- Work center schedule views include work order or operation number, item number, and item quantity
- Work center schedule includes order status, including released, in progress, and on hold
- Work center schedules include previous and next load center information
- Work center schedule includes tool information
- Work center schedules include load summaries and backlog
- Work center schedules displays capacity and resources by project
- Multiple UOM for scheduled quantities
- Categorizes work center schedules into groups
- Planner can stipulate the time horizon in the schedule
- Forward scheduling
- Back scheduling
- Combines forward and back scheduling
- Schedules particular orders via individual load centers
- Calculates average queue length and deviation
- Reschedules and deschedules tasks
- Sequencing based on start or due date
- Sequencing uses priority codes as well as start and due dates
- Queue compression used in sequencing
- Critical ratio is used to sequence work order operations
- Groups operation sequences
- Online sequencing modifications
- Work orders and work centers are displayed in a Gantt chart
- Displays current and expected capacity utilization by work center
- Queue management and input/output reporting parameters can be set online
- Reports on queue compression percentage by work center
- Displays planned queue against backlog (expressed in days) by load center, department, and plant
- Input/output analysis reports
- Generates reports on work center schedules
- Queue management reports
- Tracks part status via routing for products produced in-house and sub-contract parts
|
|
Production Planning Features and Functions
|