Forgot password?
|
|
|
|
We were unable to sign you in.
Please verify your user name and password and try again. If you do not have a TEC account, register now.
Software Evaluation Features and Functions

Before you can begin comparing enterprise software solutions, it's important to understand the features and functions that you need to run your business.Below, you'll find links to comprehensive models of features and functions for several types of enterprise software, accounting, asset management, business intelligence (BI), content management systems (CMS), enterprise resource planning (ERP), human capital management (HCM), product lifecycle management (PLM), product portfolio management (PPM), relationship management, and supply chain management (SCM). These feature/function models can help you better understand vendor offerings as you compare software solutions, including

imgHeaderSep

Material Requirements Planning (MRP) Features and Functions



  • Online run option parameters for material requirements planning (MRP) processing

  • Customizable planning horizonz

  • Fixed or flexible buffer stock rules

  • Inventory can be excluded based on location

  • Fixed order quantity or EOQ order rules

  • Order quantity modifiers include minimums, maximums, and multiples, as well as specific component scrap rates, and shrinkage rates

  • Lead time offset for parent based on component lead time

  • Overrides inventory quantity calculations to take on-hand quantities into account

  • Material requirements scheduled according to operation start date

  • Suggests discrete jobs, repetitive schedules, and parts requisitions

  • Generates material plans for models, prototypes, option classes, and configured items

  • Plans incorporate BOMs, including common and phantom

  • Purchasing requisitions are processed automatically

  • Creates supplier shipping schedules based on MPS or MRP requirements

  • All levels of a BOM can be pegged to customer orders online (viewed and processed)

  • Uses action messages for canceling, defering, ordering, or prioritizing tasks

  • Planning attributes include ATP calculations

  • Tracks late orders, supplier changes, and recommended requisitions

  • Tracks orders by component, supplier, or requirements plan

  • Financial impact calculations included forecasted inventory turnover

  • Discrete jobs and purchase requisitions can be rescheduled

  • Follow-up report includes any corrective, preventative, or other actions taken, and their results

  • On-hand inventory, requirements, receipts, and FPO are included in the material requirements planning (MRP) report

  • Materials requirement planning (MRP) cost reporting summarizes standard, current, or other costs by product line

  • Leads times can be displayed in a graphical format

  • Manual changes to modeling parameters, including supply, demand, product structure, and cost

  • Impact analysis

  • Uses ordering rules to change material requirements planning (MRP) recommendations to orders

  • Provides user-identified fields for blocking MRP on certain items

  • Controls and tracks changes to BOMs

Production Planning Features and Functions
Use this index to search for white papers related to commonly used search terms A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Others 
Recent Searches
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Others
A: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
B: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
D: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
E: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
F: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
G: 1 2 3 4 5 6 7
H: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
I: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
J: 1 2 3 4 5
K: 1 2 3 4
L: 1 2 3 4 5 6 7 8 9 10 11 12 13 14
M: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
N: 1 2 3 4 5 6 7 8
O: 1 2 3 4 5 6 7 8 9 10 11 12 13 14
P: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Q: 1 2
R: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
T: 1 2 3 4 5 6 7 8 9 10 11 12 13
U: 1 2 3
V: 1 2 3 4
W: 1 2 3 4 5 6 7 8 9 10 11
X: 1
Y: 1
Z: 1
Others: 1 2 3


©2013 Technology Evaluation Centers Inc. All rights reserved. Search powered by Google