Inspection & Risk Assessment Features and Functions
|
- Users can conduct multiple inspections at multiple points on an asset or infrastructure
- Users can set up and record results of a risk-based assessment defining risk and criticality of failure
- System automatically increases the frequency of inspection if the risk increases
- Users can define a "confidence rating" on the risk
- For a given assessment, users can provide inspectors with nominal (i.e. expected) value
- Users can provide inspectors with historical information including last value, date, and description
- Replacement frequency can be tracked for inspection tools
- Users can define a formula to determine the critical value for inspection readings
- Standard work order or PM routine will be issued automatically if the critical value is reached
- Users can define minimum and maximum threshold values for inspection readings
- Users can define a tolerance percent
- Regression analysis is used to predict the next date for reaching the critical value
- Users can record an "extreme value"
|
|
Preventive maintenance Features and Functions
|