User-defined Activity Triggers Features and Functions
|
- Activity triggers alarm, pager, or e-mail
- When downtime exceeds a threshold value
- When measures exceed control limits
- When measures trend within certain a percent of control limits
- When average MTBF is outside a given range of values
- When equipment is due for warranty work
- When parts have not arrived for a work order coming due
- When wait time within a workflow exceeds a value
- When activity times within a workflow exceed standard
- When a PM routine's "critical percent" reaches a threshold
- When the rate of expenditure will cause an overrun
- When a failure has repeated within a user-defined period
|
|
Triggers Features and Functions
|