Avoid the Perils of Service Parts Planning in Supply Chain Management
Olin Thompson and P.J. Jakovljevic -
8/1/2005
More On Service Parts Planning
Inventory
planning and management is generally a well-researched and documented and applied
discipline. However, the vast majority of work and associated software products
are directed at servicing the needs of the new parts production supply chains,
moving product from the likes of Proctor & Gamble to Wal-Mart
across the globe (see Linking
Planning and Execution Systems for Retailers' Nirvana—Improved Visibility and
Fulfillment). It cannot be understated that significant differences exist
between the new parts production supply chain and the service and replacement
parts supply chain. Companies attempting to manage their service and replacement
parts using conventional, new product inventory methods are missing significant
opportunities for improved efficiency and effectiveness in their operations,
if not working at their peril.
Part
Three of Lucrative but "Risky" Aftermarket: Service and Replacement Parts SCM
series.
Table
1 depicts how new parts production and service supply chains operate differently
and require systems that cater to their differing needs. For example, demand
(inventory turnover) for new products is generally much higher than for the
counterpart service parts, particularly if the serviceable product is a brand
new model with an unknown behavioral history. Increasing product reliability
requirements further intensify this difference. Inventory turnover
(synonymous with inventory turns) is the number of times that an inventory
cycles, or "turns over," during the year, and a frequently used method to compute
inventory turnover is to divide the average inventory level into the annual
cost of sales. For example, an average inventory of $3 million divided into
an annual cost of sales of $21 million means that inventory turned over seven
times.
Also,
conventional inventory ordering/cost management strategies, like economic
order quantity (EOQ), are based on the assumption that there is a strong,
continuous demand or velocity of product throughout the system. For example,
EOQ (synonymous with economic lot size and minimum cost order quantity)
is a type of fixed order quantity model that determines how much of an item
is to be purchased or manufactured at one time, with the intent to minimize
the combined costs of acquiring and carrying inventory. The basic formula takes
into consideration annual demand, average cost of order preparation, annual
inventory carrying cost percentage, and unit cost. Needless to say, such simplified
formulas are not applicable for spare parts where there is demand for an item
is little, uncertain, or not at all.
Thus
demand variability or uncertainty is another issue that complicates service
and replacement parts planning. Variability in new products supply chains is
magnified by the bullwhip effect. The bullwhip effect is an
extreme change in the upstream supply position in a supply chain resulting from
a small change in demand, downstream in the supply chain. As a result, inventory
can quickly move from being backordered (needed in an expedited manner) to being
in excess. Such a state is caused by the serial nature of communicating orders
up the chain combined with the inherent transportation delays of moving product
down the chain. In new parts production supply chains, this negative effect
can be mitigated or even eliminated by synchronizing the supply chain, through,
for example, collaborative planning, forecasting and replenishment
(CPFR), and other more adaptive supply chain management (SCM) techniques.
Promotional pricing can also be used, to some extent, to manage demand fluctuations
by stimulating demand of new products.
However,
demand for spare parts is driven mostly by breakdowns, and much less by planned
maintenance. Therefore, safety stock, which is often a minor component of new
product inventory levels, remains the sole component for service parts and the
only method for managing variability. In general, safety stock (synonymous
with buffer stock and reserve stock) is a quantity of stock
planned to be in inventory to protect against fluctuations in demand or supply.
This
is Part Three of a four-part note.
Part
One discussed the business challenge.
Part
Two analyzed changes in the scope of service parts SCM.
Part
Four will cover players and benefits and make user recommendations.
Production Versus Service Supply Chains
While supply chains can be complex and multi-echelon for both new products and service parts, the impact is much different. Namely, in new product supply chains, echelons and nodes increase the complexity of distribution planning and the scheduling of material transfers. In the case of service parts, echelons offer opportunities that significantly reduce safety stock by aggregating volume at higher levels.
Pooling
spare parts among divisions and companies with similar assets is a strategy
being increasingly considered, since pooled inventories can reduce costs while
ensuring that service requirements are met for all parties. Namely, to meet
same-day service requirements for products with very low demand rates, inventory
must be positioned in a large number of geographic locations. For example, Cisco,
maintains inventory in over 700 locations including field locations, distribution
centers, and repair centers. These locations may be owned by the manufacturer,
distributors, third party logistics providers, or repair providers, and must
manage not only the forward movement of inventory, but also the reverse logistics
flows for return of damaged items.
Incidentally, basic multi-echelon inventory optimization strategies (regardless of the part being a new or a spare one) involve either pooling demand by keeping inventory at central locations, or forwarding position/push stock into field locations to give great customer service. A very general rule of thumb is for the first approach to be used when demand volatility is high and demand volume is low. The latter is more appropriate for the opposite—low demand volatility and high demand volume. For some new parts, there may also be anassembly or light manufacturing postponement strategy, in order to store basic product configurations, rather than variations.
| Area/Metric |
Production
Supply Chain |
Service
Supply Chain |
| Inventory
turns |
6 to 50 a year |
1 to 4 a year |
| Inventory
events |
predictable / forecastable |
random / intermittent |
| Response
times |
manufacture/distribution lead time |
mix of same-day, next day, response |
| Delivery
network |
move to simplification, rationalization |
increasing flexibility to deliver differentiated, rapid response service |
| Profit
margins |
decreasing |
increasing |
| Inventory
Strategy |
maximum velocity to meet schedule |
pre-position in network in anticipation of demand |
Table
1: Differences between product supply and service supply chains.
Source: MCA Solutions
Replenishment processes for service and replacement parts differ significantly from those for new products too, since new product inventories are always replenished from regularly (if not continually) running production batches. The key issue is to synchronize distribution needs and production schedules. Again, breakdown repair is a major source for service and replacement part inventories, especially for expensive products (whereas some spare "widgets" can leverage new parts planning practices).
Product
structure is an another factor driving the differing requirements of the service
supply chain. Namely, while product life cycles are decreasing, the service
function must support not only newly introduced products but include out-of-production
products with low demand and very long manufacturing lead times. These means
support not only for a very large number of parts and products, but also a requirement
to stock them at different levels of the bill of materials (BOM). For
example, this involves a complete product, a repair assembly, and component
parts.
To
that end, pre-introduction spare parts planning defines service offerings and
warranties, develops maintenance BOM and approaches, and determines expected
reliability, whereas the new product introduction (NPI) phase must
determine initial provisioning based on estimated sales and failure rate, and
develop budgets. Further, in-production planning would have to manage engineering
changes, determine actual failure rates and causal factors, balance new buys
with expected returns, manage supply and end of production, and manage warranty
and contracts.
Last
but least, the end-of-life (EOL) phase determines the last time buys
based on expected returns, and manages the disposal of product and components.
Minimizing the number of new parts introduced into the inventory is a key goal,
particularly as parts face obsolescence criteria established by the organization,
such as being superseded by new model introductions. Obsolete inventory will
never be used or sold at full value, while disposing of the inventory may reduce
a company's profit. Part substitution and harvesting or reusing components during
repair add to the complexity of this process.
Thus, more capable spare parts planning systems should be able to help enterprises plan spare parts inventories based on seasonality; statistical forecasting methodologies; carrying costs; customer service levels; parts' obsolescence and criticality measures; product life cycle stage/curve; certain leading indicators (e.g., machine population, part failure rates and like causal variables); and historical demand, to name some factors.
These systems may also use sporadic or intermittent demand methods and spike demand analysis for slow-moving items, and handle return, repair, and refurbishment forecasting, often offer flexible forcing abilities (e.g., forecast at higher, aggregated levels and then prorate down to individual items). At the same time, they may also show strong performance when handling a huge number of item or location combinations and then suggest how to redistribute stock among locations. They might also be able to provide flexible cost analysis, including actual repair cost, standard cost, carrying cost and salvage value, provide flexible simulation abilities such as service-level and inventory cost simulations), or allow for automation, analysis, and exception reporting for planners—all with the idea to lower capital investment while doing the least damage to customer service levels for critical parts.
This
concludes Part Three of a four-part note.
Part
One discussed the business challenge.
Part
Two analyzed changes in the scope of service parts SCM.
Part
Four will cover players and benefits and make user recommendations.
About
the Authors
Olin
Thompson is a principal of Process ERP Partners. He has over twenty-five
years experience as an executive in the software industry. Thompson has been
called "the Father of Process ERP." He is a frequent author and an award-winning
speaker on topics of gaining value from ERP, SCP, e-commerce and the impact
of technology on industry.
He
can be reached at Olin@ProcessERP.com
Predrag
Jakovljevic is a principal analyst with TechnologyEvaluation.com (TEC),
with a focus on the enterprise applications market. He has nearly twenty years
of manufacturing industry experience, including several years as a power user
of IT/ERP, as well as being a consultant/implementer and market analyst. He
holds a bachelor's degree in mechanical engineering from the University of Belgrade,
in the former Yugoslavia, and he has also been certified in production and inventory
management (CPIM) and in integrated resources management (CIRM) by APICS.