Integrated enterprise resource planning (ERP) software solutions have
become synonymous with competitive advantage, particularly throughout
the 1990's. ERP systems replace "islands of information" with a single,
packaged software solution that integrates all traditional enterprise
management functions like financials, human resources, and manufacturing
& logistics. Knowing the history and evolution of ERP is essential to
understanding its current application and its future developments. Following
is the genesis of ERP by era.
1960s
- Pre-Computer Era
The focus of manufacturing systems in the 1960s was on inventory control.
In those days when a computer would occupy an entire wing of a building
at a local university, most manufacturing companies could not afford to
own one. However, companies were able to afford to keep inventory on hand
to satisfy customer demand. It was the age of the reorder point system
(ROP) where the assumption was that the customer would continue to order
what they had before and the future would look very much like the past.
In most industries this was a valid assumption, since product life cycles
were measured in years.
Inventory
was regarded as an asset not only on the balance sheet but also in the
mind of the average manager. Therefore, production planners created schedules
and managed materials by hand. In the production control office, the manual
explosion of Bills of Materials (BOMs) often resulted in errors. Index
card files had been used to record material allocations, receipts, and
issues. When the unallocated inventory balance on the card seemed low
for a certain part, a planner would give a card to a buyer, who would
then place a new purchase order. Those card files provided a real help
to a planner as long as each index card had been updated in a timely manner
and put in the right place.
The
order entry/sales department usually created the plant schedule. As a
result, persons who had little or no access to material availability information
loaded forecasted sales and actual customer orders into the schedule.
This lack of visibility, combined with the cumbersome inventory record-keeping
process, caused frequent schedule changes and delayed customer deliveries.
Often the shop would start an order only to learn that required material
was not available. The resulting excessive work in progress (WIP) and
raw materials tied up unnecessary capital funds and shop floor space,
which ultimately led to a number of other missed opportunities.
1970s/1980s
- Advent of Computers in Manufacturing
When computers finally became small and affordable enough to be deployed
by an average manufacturing company, the resolution of materials mismanagement
initially gained the highest priority status. Silently, the need to order
only what was really needed crept onto the horizon. No longer could a
company afford to order some of everything. Orders had to be based on
what was being sold. What was already in inventory or committed to arrive
on a purchase order offset this requirement. As a result, Materials Requirements
Planning (MRP) computer systems were developed to provide for 'having
the right materials come in at the right time'. The Master Production
Schedule (MPS) was built for the end items. The MPS fed into the
MRP which contained the time-phased net requirements for the planning
and procurement of the sub-assemblies, components, and raw materials.
MRP
- The Initial Impact
The impact that the computer had on material planning and enterprise management
was huge. From the manual planning and huge posting card decks, this new
computer system promised to automatically plan, build, and purchase requirements
based on the items to be shipped, the current inventory, and the expected
arrivals. The posting originally done on the manual input/output cards
was replaced by transactions directly made in the computer and documented
on pick lists. The amount on inventory was visible to anyone with access
to a computer without having to go to the card deck and look it up.
MRP,
or 'little MRP', represented a huge step forward in the planning process.
For the first time, based on a schedule of what was going to be produced,
which was supported by a list of materials that were needed for that finished
item, the computer could calculate the total need and compare it to what
was already on hand or committed to arrive. This comparison could suggest
an activity to place an order, cancel orders that were already placed,
or simply move the timing of these existing orders. The real significance
of MRP was that, for the first time, the planner was able to answer the
question 'when?'. Rather than being reactive and waiting until the shortage
occurred, the planner could be proactive and time phase orders, including
releasing orders with multiple deliveries.
Nevertheless,
some simplifying assumptions were needed to allow the computers of the
day to make the required calculations. One was that the orders should
be started at the latest possible date to provide for minimal inventory
while still serving the customer's need on time. This method is referred
to as 'backward scheduling'. Therefore, all orders were scheduled backwards
from the desired completion date to calculate the required start date.
There was no slack time in the schedule and the downside of this assumption
was that if there were any hiccups in the execution of the plan, the order
would most likely be late to the customer. If only one part needed for
the finished part was going to be late, there was no automatic way to
know the impact on the other needed parts. Slack was built into the schedule
through conservative lead times. Despite this drawback, the benefits far
outweighed the costs and more companies began to embrace the tools and
techniques of MRP.
CRP
- The Next Development
As more people learned how to utilize this material planning methodology,
they quickly realized something else very important was missing. It did
not suffice to have all the parts to get the job done, sufficient plant
capacity was needed as well. The idea of closing the loop with a capacity
plan was introduced and 'closed loop MRP', 'big MRP', or Capacity Requirements
Planning (CRP) was born.
At
the same time, computers were increasing in power and decreasing in price.
The computing capacity to do the extra mathematical computations was affordable
and available. Now, not only could the materials be calculated, but also
a capacity plan based on those material plan priorities could be created.
In addition to the bills of materials needed for each of the finished
parts, defined paths for the production process were necessary. Defined
paths for the production process, commonly called 'routings', specified
the machines or group of machines (work centers) to be used to build the
parts so that capacity and load could be planned and scheduled.
Another
critical assumption needed to complete the computations of the computers
of the day was that infinite capacity existed at each of these work centers
to satisfy this calculated demand when it was required. Infinite capacity
is not an accurate reflection of reality, and this drawback in the use
of MRP/CRP remains present till today. However, for the first time, reports
were available where the overload conditions could be identified and proactively
resolved for each machine. This allowed the preparation of plans and options
to address the overload situation before the problem occurred. Typically,
lead times were long enough to allow work centers to smooth out unbalanced
workloads in the short term and still support the overall required completion
of the work order.
After
the BOM explosion and time phasing of materials and capacity had been
accomplished through MRP/CRP, other problems on the shop floor became
evident. While planners created a feasible schedule, with all the right
material on its way or in stock, one would discover that maintenance on
a critical piece of equipment had been overlooked or that skilled production
workers were unavailable. Therefore, planning of all manufacturing resources,
other than materials and nominal capacity, became the 1st priority.
MRPII
- Connecting Manufacturing and Finance
Once again the technology improved simultaneously with the realization
that as every piece of inventory moved, finances moved as well. For example,
if a part was received at the factory, not only should the inventory on
hand go up but also there should be a corresponding increase in the raw
material inventory asset on the financial books. This is balanced by an
increase in the liability level in the accounts payable account. As a
group of parts moves to the shop floor to build the finished product,
the raw material asset should go down and the work in process asset should
go up. The labor and overhead charges from the shop floor personnel also
are added to the work in process asset account with an offset to the accounts
payable account. When the finished part completes it route through the
shop, the work in process asset account goes up. As the finished product
is sold, the finished good asset account goes down and the accounts receivable
asset account goes up. Consequently, at every step of the way, as the
inventory moves, financial accounting moves with it - in duplicate - with
balanced credits and debits.
Available
technology now had the power and was affordable enough to track this inventory
movement and financial activity. As a result, the basic programs for manufacturing
were integrated into one package using a common database that could be
accessed by all users. These were the first Manufacturing Resource Planning
(MRPII) packages, used predominantly by discrete manufacturers
(See Glossary). Since MRP assumes infinite capacity
and strict adherence to schedule dates, process and flow manufacturers
(See Glossary) found little use for it. They instead
focused their efforts during the same time on other aspects of the supply
chain, particularly forecasting, purchasing, and distribution.
MRPII
does not mean that MRP was done incorrectly the first time, it is rather
its significant evolution. MRPII closed the loop with the financial accounting
and financial management systems. The American Production and Inventory
Control Society (APICS) defines MRPII as follows:
'A method
for the effective planning of all resources of a manufacturing company.
Ideally, it addresses operational planning in units, financial planning
in dollars, and has a simulation capability to answer "what if" questions.
It is made up of variety of functions, each linked together: business
planning, sales and operations planning, production planning, and the
execution support systems for capacity and material. Output from these
systems is integrated with financial reports such as the business plan,
purchase commitment report, shipping budget, and inventory projections
in dollars. MRPII is a direct outgrowth and extension of closed loop
MRP.'
For the first
time, a company could have an integrated business system that provided
visibility to the requirements of material and capacity driven from a
desired operations plan, allowed input of detailed activities, translated
all this activity to a financial statement, and suggested actions to address
those items that were not in balance with the desired plan. Good information
leads to good decisions, and therefore these integrated, closed-loop information
systems provided a competitive advantage.
Meanwhile,
other functional areas of companies had also been requesting help from
data processing departments, today known as Management Information Systems
(MIS), Information Systems (IS), or Information Technology (IT) departments.
Systems were developed for support of each major functional area. As an
example, Accounting and Finance had a set of programs that helped it manage
the general ledger, accounts payable & receivable, as well as capital
assets and financial reporting. These accounting programs were combined
to form an integrated system for accounting, likewise MRPII integrated
the manufacturing programs. Sales, Engineering, Purchasing, Logistics,
Project Control, Customer Service, and Human Resources followed suit and
each developed their own sets of integrated computer systems. Unfortunately,
these disparate systems were unable to interact and exchange information.
Information exchanges between these systems, often time consuming and
error prone, were by interface programs.
1990s
- Enterprise Resource Planning
By the time each functional area of a company had developed its integrated
software program, the need for tightly integrating them became obvious.
The next major shift during the late 1980s and early 1990s was that 'time
to market' was becoming increasingly short. Lead times expected by the
market continued to shorten and customers were no longer satisfied with
the service level that was considered world class only a few years earlier.
JIT,
ATP, and Other Factors
Customers
were demanding to have their products delivered when, where, and how they
wanted them. Companies were therefore compelled to develop and embrace
the philosophies of Just in Time (JIT) and supplier partnerships as a
way to remain competitive.
During
the same time frame, the cost of goods sold was shifting drastically from
labor to purchased materials. Consequently, planners needed to know materials
allocations or finished goods' available-to-promise (ATP) values, immediately
after customer order entry. On the other hand, buyers needed to know the
sales plan several months in advance in order to negotiate prices for
individual materials. Empowerment of employees was needed to provide the
agility that was required to compete in the market.
The
need to develop a system with tightly integrated programs that would use
data stored on one common database and would be used enterprise-wide (actions
in one department's program driving actions elsewhere), became the highest
priority for IT professionals. No longer was it tolerable to submit a
request to the IT department and wait several man-months of programming
time to obtain this critical information. This common-database, company-wide
integrated system was named Enterprise Resource Planning (ERP).
ERP
Defined
APICS defines
ERP as follows:
'An
accounting-oriented information system for identifying and planning the
enterprise-wide resources needed to take, make, ship, and account for
customer orders. An ERP system differs from the typical MRPII system in
technical requirements such as graphical user interface (GUI), relational
database management system (RDBMS), use of fourth-generation language
(4GL), and computer-aided software engineering (CASE) tools in development,
client/server architecture, and open-system portability.'
Impact
of the PC
The cost
of technology continued to plummet and the advent of the personal computer
(PC) revolutionized once again the face of business management systems.
At a fast pace, the large inflexible mainframes were replaced by new client/server
technology. The power of these small PCs exceeded the power of the large
mainframes that were routine only a few years earlier. It became possible
to run a fully integrated MRPII system on a small PC.
The changing
pace of technology had once again leveraged forward the planning and control
systems in recognition of a real business need. In addition, unlike previous
evolutions, the ERP software vendors offered these critical business applications
also to non-manufacturing companies.
ERP is far
more than just MRPII which runs on a client/server architecture. ERP encompasses
all the resource planning for the enterprise including product design,
warehousing, material planning, capacity planning, and communication systems,
to name but a few. These critical business issues affect not only manufacturing
companies but also all companies that desire to achieve competitiveness
by best utilizing their assets, including information. In other words,
ERP systems help companies become leaner by integrating the basic transaction
programs for all departments, allowing quick access to timely information.
However, ERP inherited MRPII's basic drawbacks, which are the assumption
of infinite capacity and the inflexibility of scheduling dates, preventing
companies from taking full advantage of speedy information flow.
2000s
- Future of ERP
During the
last three years, the functional perimeter of ERP systems began an expansion
into its adjacent markets, such as supply chain management (SCM), customer
relationship management (CRM), product data management (PDM), manufacturing
executions systems (MES), business intelligence/data warehousing, and
e-Business. The major ERP vendors have been busy developing, acquiring,
or bundling new functionality so that their packages go beyond the traditional
realms of finance, materials planning, and human resources.
Capacity
Planning
To circumvent
MRPII's capacity planning limitations, planners turned to various ways
of off-line capacity planning: either manually, with the help of spreadsheet
programs, or with the help of new advanced planning and scheduling (APS)
systems. APS systems are designed as bolt-ons with the idea of plugging
into an ERP system's database to download information and then create
a feasible schedule within identified constraints. The new schedule can
then be uploaded into the ERP system thereby replacing the original MRP
results. These APS systems typically offer simulation ("what if") capabilities
that allow the planner to analyze the results of an action before committing
to that action through the ERP system. Some of these systems go one step
further by offering optimization capabilities. They automatically create
multiple simulations and recommend changes in the supply chain within
the existing constraints.
Global
Supply Chain Management
While most
traditional ERP software enables the integration and management of critical
data within enterprises, companies have increasingly recognized the need
to deploy more advanced software systems that manage the global supply
chain by enhancing the flow of information to and from customers, suppliers
and other business partners outside the enterprise. More recently, the
availability and use of the Internet has created a demand for software
that operates across the Internet and intranets. This global logistics
concept merged with above described constraint-based optimization solutions
called advanced planning systems (APS) and specialized warehouse management
software (WMS), resulting in SCM (See Advanced
Planning and Scheduling: A Critical Part of Customer Fulfillment).
The major
ERP players already have offerings or strategies addressing this important
need (See The
Essential Supply Chain and SAP
APO - Will It Fill the Gap).
Customer
Relation Management
Another important
area of functional expansion is in the front office/customer relationship
management (CRM) arena. Customers are demanding applications and tools
that allow them to link back-office ERP systems with front-office CRM
systems. They are also demanding enhanced capabilities for e-Business,
especially business-to-business (B2B) and business-to-customer (B2C) electronic
commerce. The leading ERP vendors have begun to discern the opportunity
these products present and the benefit potential for organizations implementing
them. CRM has gone from a vast field of point solutions to suites of customer
care applications covering sales force automation (SFA), field service,
telesales, call center, marketing automation, etc.
ERP vendors
have explored various routes to penetrate the CRM and e-Commerce markets,
such as developing in-house products (SAP, with its telesales module and
mySAP.com portal), acquiring point specialists to augment their offering
(Oracle through its acquisitions of Versatility for call center, Tinoway
for field service, and Concentra for its product configurator module),
merging full suites (Baan with its acquisition of Aurum in 1997, and PeopleSoft
with its acquisition of Vantive in 1999), and partnering with CRM and
e-Commerce leaders (J.D. Edwards with Siebel and Ariba, and SAP with Recognition
Systems Group for its market campaigns module).
Real-Time
Performance Analysis
ERP software's
scope will go beyond traditional transactional business functions by enabling
organizations to deliver real-time performance analysis directly on the
desktops of CFOs, CEOs, and business managers. Major ERP vendors have
been shifting focus from routine users' transaction requirements to the
overall organization's business imperatives, thereby helping lines-of-business
become more knowledgeable and proactive. Instead of requiring a collection
of processes, the system should appear to each user as a vast source of
information. While relational databases, currently used by ERP systems,
are good at retrieving a small number of records quickly, they are not
good at retrieving a large number of records and summarizing them on request.
Therefore, major ERP vendors have been increasingly embracing OLAP (On
Line Analytical Processing) tools, that provide a high-level aggregated
view of data.
Looking
to the Future
Global financial
capabilities (including support for the Euro), product data management
(PDM), advanced planning and scheduling (APS), warehouse management systems
(WMS), product configurators via the Web, supply chain management (SCM),
customer relationship management (CRM), e-Commerce, business intelligence
(BI), and component (object-oriented) architecture will remain the order
winners for the next two years. After that period of time, we believe
these functional and technological features will be demoted into commodities
(order qualifiers).
We believe
that, within the next two years, ERP will be redefined as a platform for
enabling e-business globally. Originally focused on automating the internal
processes of an enterprise, ERP systems will begin to include customer
and supplier-centric processes as well. ERP software suites will become
universal business applications that will encompass front-office, business
intelligence, and e-commerce/supply chain management, and ERP will no
longer be an acronym sufficient enough to cover it, so we would like to
suggest a new acronym - iERP, meaning inter(net)-enterprise resource planning.
Summary
Knowing the
history and evolution of ERP is essential to understand its current application
and its future developments. ERP is an important step in an ongoing evolution
of computer tools that began in the 1960s, as depicted in Figure 1. Each
evolutionary step is built on the fundamentals and principles developed
within the previous one.
Figure
1.

It should
be noted that the underpinning of the most sophisticated business applications
systems today remains the same mathematical model introduced in the first
MRP systems. This model of "what do I need, what do I already have, and
what do I need to get and when" will be the backbone of the integrated,
Internet-enabled supply chain.
Technology
can never totally replace an effective demand management process. Therefore
we regard as frivolous some analysts' predictions of ERP's demise. The
fundamental shortcomings of ERP revealed by the advance of technology
and increasing customer demands are addressed by extended ERP point solutions
(bolt-on's), and ERP vendors are expected to continue their quest for
delivering more complete solutions.
Glossary
Advanced
Planning System (APS): A decision support system that allows manipulation
of the data and viewing of possible changes without disrupting operations.
It helps a company plan all aspects of the supply chain, including transportation
of products, forecasting of product demand, sales and stocking, stocking
of finished goods, scheduling of finished goods production, scheduling
of materials and resources in the production facility, and scheduling
of vendors to supply the plant or warehouses with materials.
APICS:
A nonprofit educational organization consisting of over 70,000 members
in the production/operations, materials, and, more recently, integrated
resource management areas.
Available-to-Promise
(ATP): The uncommitted portion of a company's inventory and planned
production, maintained in the master schedule to support customer order
promising.
Bill of
Material (BOM): A listing of all the subassemblies, intermediates,
parts, and raw materials that go into a parent assembly showing the quantity
of each required to make an assembly.
Business
Intelligence (BI): Sets of tools that provide graphical analysis of
business information in multidimensional views thus enabling people to
make better decisions and improve their business processes.
Capacity
Requirements Planning (CRP): The function of establishing, measuring,
and adjusting limits or levels of capacity. The term CRP in this context
refers to the process of determining in detail the amount of labor and
machine resources required to accomplish the tasks of production.
Customer
Relationship Management (CRM): Software systems that range from simple,
off-the-shelf contact management solutions to high-end interactive selling
suites that combine sales, marketing, and executive information tools.
These include product configuration, quote and proposal management, and
marketing encyclopedias. Some systems extend functions to include complex
pricing, promotions, commission plans, team selling, and campaign management.
Enterprise-level solutions installed at large companies with hundreds
or even thousands of users have capabilities for call center/help desks,
field service, forecasting, and analysis.
Discrete
Manufacturing: Production of distinct items such as automobiles, appliances,
or computers.
Flow Manufacturing:
A form of manufacturing organization, in which machines and operators
handle a standard, usually uninterrupted, material flow. The operators
generally perform the same operations for each production run. A flow
shop is often referred to as a mass production shop or is said to have
a continuous manufacturing layout. Each product, though variable in material
specifications, uses the same flow pattern through the shop. Production
is set at a given rate, and the products are generally manufactured in
bulk.
Infinite
Loading: Calculation of the capacity required at work centers in
the time periods required regardless of the capacity available to perform
this work.
Just-in-Time
(JIT): A philosophy of manufacturing based on planned elimination
of all waste and continuous improvement of productivity. It encompasses
the successful execution of all manufacturing activities required to produce
final product, from design engineering to delivery and including all stages
of conversion from raw material onward.
Master
Production Schedule (MPS): The anticipated build schedule for those
items assigned to the master scheduler. It is a set of planning numbers
that drives material requirements planning (MRP). It represents what the
company plans to produce expressed in specific configurations, quantities,
and dates.
Material
Requirements Planning (MRP): A set of techniques that uses bill of
material data, inventory data, and master production schedule to calculate
requirements for materials. It makes recommendations to release replenishment
orders for materials. Further, because it is time-phased, it makes recommendations
to reschedule open orders when due dates and need dates are not in phase.
Manufacturing
Execution System (MES): A factory floor information and communication
system with several functional capabilities. It includes functions such
as resource allocation and status, operation/detailed scheduling, dispatching
production units, document control, data collection and acquisition, labor
management, quality management, process management, maintenance management,
product tracking and genealogy, and performance analysis. It ca provide
feedback from the factory floor on a real-time basis. It interfaces with
and complements ERP systems.
Process
Manufacturing: Production that adds value by mixing, separating,
forming, and/or performing chemical reactions. It may be done in either
batch or continuous mode.
Product
Data Management (PDM): A system, which controls all product-related
data and associated workflow processes within an enterprise. Product data
management systems replace paper-based processes and information storage
with a single, centralized data repository that enables authorized users
throughout a company to access and update current product information,
while ensuring they follow specific procedures. PDM vendors recently have
emphasized the similarities between PDM and groupware technology appropriate
to a range of business environments. Besides ensuring data integrity using
relational database technology, both include workflow and Web-based applications
that ease collaboration efforts.
Reorder
Point (ROP) System: Inventory method that places an order for a lot
whenever the quantity on hand is reduced to a predetermined level known
as the reorder point.
Routing:
Information detailing the method of manufacture of a particular item.
It includes the operations to be performed, their sequence, the various
work centers involved, and the standards for setup and run time.
Sales
Force Automation (SFA): Technology used to improve the efficiency
and effectiveness of the sales force by streamlining and speeding up processes
and eliminating errors. It allows the sales force to access up to date
information of customer accounts and pricing. It also eradicates errors
involved with placing orders.
Supply
Chain Management (SCM): The processes from the initial raw materials
to the ultimate consumption of the finished product linking across supplier-user
companies.
Warehouse
Management System (WMS): Systems that integrate work performed within
warehouses and distribution centers with a transactional-type information
system. Simple storage and retrieval of materials is superseded by strategies
to increase throughput and productivity by managing the full range of
warehouse resources to effectively manage warehouse business processes
and direct warehouse activities, including receiving, put away, picking,
shipping, and inventory cycle counts. Most support radio-frequency communications,
allowing real-time data transfer between the system and warehouse personnel.
Inovis Delves into PIM by Snatching QRS
Part Two: QRS Marketing | Inovis Delves into PIM by Snatching QRS
Part One: Event Notes | Not All Acquisitions Happen: JDA and QRS
Part Two: Market Impact | Not All Acquisitions Happen: JDA and QRS
Part One: Event and Market Impact | The Name and Ownership Change Roulette Wheel for Marcam Stops at SSA Global
Part Three: Last-Ditch Effort by Invensys | The Name and Ownership Change Roulette Wheel for Marcam Stops at SSA Global
Part One: Event Summary | Master Requirement Planning and Master Production Scheduling Software: Hard Facts
Part Two: Materials Requirement Planning and Master Production Scheduling | Intentia: Stepping Out With Fashion and Style
Part Four: Movex Case Study Continued With User Recommendations | Intentia: Stepping Out With Fashion and Style
Part Three: Movex, a Case Study of Fashion Industry Software | Intentia: Stepping Out With Fashion and Style
Part Two: Software Challenges in the Fashion Industry | The Trap of Accountancy Systems; When to Move on to ERP | Fed Warms Up to ERP Spending, but Will Contractors and Their ERP Vendors Comply?
Part Two: Challenges and User Recommendations | Feds Warms Up to ERP Spending, but Will Contractors and Their ERP Vendors Comply?
Part One: Event Summary and Market Impact | Retail Market Dynamics for Software Vendors
Part Two: Progress | Retail Market Dynamics for Software Vendors
Part One: Software Requirements for Retail |
TEC Talks to the Compiere ERP/CRM ProjectFree and Open Source Software Business ModelsPart Three: Compiere/ComPiere | TEC Talks to the Open For Business ProjectFree and Open Source Software Business ModelsPart One: OFBiz | Enterprise Process Improvement (EPI) Software:
Customer and Software Vendor Collaboration | PeopleSoft Revamps World for Its Mid-Market "Express" Conquest
Part Four: Challenges and User Recommendations | PeopleSoft Revamps World for Its Mid-Market "Express" Conquest
Part Three: Strengths | PeopleSoft Revamps World for Its Mid-Market "Express" Conquest
Part Two: Market Impact | SCM Software for Real World Manufacturing: A Case for Mission Critical Use | PLM Coming of Age: ERP Vendors Take Notice | Future Compatible | Buy, Build, or Somewhere Between | Mid-market Getting the Taste of Some Emerging Technologies | ROI for RFID: A Case Study
Part Two: Implementation and Results | ROI for RFID: A Case Study
Part One: Company Background | Nonprofits and Public Sector: The Latest Hot Market | Intuitive Manufacturing Systems Shows Maturity in Adolescent Age
Part Four: Challenges and User Recommendations | Intuitive Manufacturing Systems Shows Maturity in Adolescent Age
Part Three: Market Impact Continued | Intuitive Manufacturing Systems Shows Maturity in Adolescent Age
Part Two: Market Impact | Intuitive Manufacturing Systems Shows Maturity in Adolescent Age
Part One: Company Overview | ERP II Demystified | Will Sage Group Cement Its SME Leadership with ACCPAC and Softline Acquisitions?
Part Seven: Challenges | Rewrite or Wrap-Around Old Software?
Part Two: Extending to the Web and Challenges | Rewrite or Wrap-Around Old Software?
Part One: Event Summary | Will Sage Group Cement Its SME Leadership with ACCPAC and Softline Acquisitions?
Part One: Event Summary | What's Wrong With Application Software? Business Changes, Software Must Change with the Business. | Process Manufacturing: Industry Specific Requirements
Part One: Introduction | Encompix--Thriving on Encompassing Complexity
Part One: Event Summary | Leveraging Technology to Maintain a Competitive Edge During Tough Economic Times -- A Panel Discussion Analyzed
Part Six: Custom Development and Single-Vendor versus Multi-Vendor | Leveraging Technology to Maintain a Competitive Edge During Tough Economic Times -- A Panel Discussion Analyzed
Part Three: Applications Hosting | Leveraging Technology to Maintain a Competitive Edge during Tough Economic Times --A Panel Discussion Analyzed
Part One: Introduction | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part Five: Challenges and User Recommendations | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part Four: SoftBrands | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part Three: Market Impact | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part Two: SoftBrands | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part One: Event Summary | ERP Systems and the ETO Manufacturing Market
Part Three: User Recommendations | ERP Systems and the ETO Manufacturing Market
Part Two: ETO versus Repetitive Differences | ERP Systems and the ETO Manufacturing Market
Part One: Event Summary | Catering to Small and Medium-Size Enterprises | Fatal Flaws in ERP Software Create Opportunity for Niche Software in CPG Companies | Cookie-cutter Solutions Won't Cut It with the Mid-Market
Part Two: Challenges and the Lower-End | Cookie-cutter Solutions Won't Cut It with the Mid-Market
Part One: Historical Relationships | Integrating All Information Assets
Part Four: What Approach Do You Take? | Integrating All Information Assets
Part Three: What Constitutes Integration? | Integrating All Information Assets
Part Two: Why is integration an issue? | Integrating All Information Assets
Part One: Why is integration an issue? | ERP and SCM Implementations
Part Two: Interfaces and Priorities | ERP and SCM Implementations
Part One: Doing Too Much Too Soon | Enterprise Applications--The Genesis and Future, Revisited
Part Six: Looking to the Future | Enterprise Applications--The Genesis and Future, Revisited
Part Five: More on ERP Evolution | Enterprise Applications--The Genesis and Future, Revisited
Part Four: Another Step in ERP Evolution | Enterprise Applications--The Genesis and Future, Revisited
Part Three: 2000s--Back to the Future | Enterprise Applications--The Genesis and Future, Revisited
Part Two: 1990s--Enterprise Resource Planning | Enterprise Applications--The Genesis and Future, Revisited
Part One: 1960s--Pre-Computer Era | The World Of Software Buying Has Changed; Will the Vendors Change With It? | BI Approaches of Enterprise Software Vendors | EAM versus CMMS: What's Right for Your Company?
Part Four: IFS and Intentia Responses | EAM versus CMMS: What's Right for Your Company?
Part Two: Integration Concerns | EAM Versus CMMS: What's Right for Your Company? Part One | The Old ERP Dilemma--The Refresh Option | Exact Software--Working Diligently Towards the "One Exact" Synergy
Part Two: Macola, the ERP and BAM Solutions | Use CMMS to Improve PdM Performance | Usability | Justification of ERP Investments
Part Four: Replacing or Re-implementing an ERP System | Justification of ERP Investments
Part Three: Costs of Implementing an ERP System | Justification of ERP Investments
Part Two: The Intangible Effects of ERP | Intentia's Movex for Food and Beverage: Gaining a Foothold in North America
Part Three: Observations and User Recommendations | Comparison of ERP and CRM Markets' Life cycle Snapshots | PeopleSoft Gathers Manufacturing and SCM Wherewithal
Part Three: The Manufacturing Industry | PeopleSoft Gathers Manufacturing and SCM Wherewithal
Part Two: Market Impact | PeopleSoft Gathers Manufacturing and SCM Wherewithal
Part One: Recent Anouncements | Fujitsu Poised to (Inter)Stage Glovia's Comeback
Part Four: Challenges and User Recommendations | Fujitsu Poised to (Inter)Stage Glovia's Comeback
Part Three: Market Impact | Fujitsu Poised to (Inter)Stage Glovia's Comeback
Part Two: Fujitsu's Support of Glovia | Fujitsu Poised to (Inter)Stage Glovia's Comeback
Part One: Event Summary | Pull vs Push: a Discussion of Lean, JIT, Flow, and Traditional MRP
Part Two: Challenges and User Recommendations | Pull vs Push: a Discussion of Lean, JIT, Flow, and Traditional MRP
Part 1: Tutorial | Deltek Remains the Master of Its Selected Few Domains
Part Six: Challenges and User Recommendations | Deltek Remains the Master of Its Selected Few Domains
Part Four: Deltek's Differentiators | Deltek Remains the Master of Its Selected Few Domains
Part Three: Company Background and Market Strategy | Deltek Remains the Master of Its Selected Few Domains
Part Two: Product Announcements 2002 | The Strategic Importance of Asset Management
Part Three: A New Framework | The Strategic Importance of Asset Management
Part Two: Implications | The Strategic Importance of Asset Management
Part One: Changing Attitudes | Support for Old Releases-Good for the User but Is It Good for the Vendor? | Sales and Operations Planning
Part Three: Game Plan Guidelines | Sales and Operations Planning
Part Two: Common Scenarios | Sales and Operations Planning
Part One: Identifying and Forecasting Demand | FRx Poised to Permeate Many More General Ledgers
Part Four: Competitors and User Recommendations | FRx Poised to Permeate Many More General Ledgers
Part Three: Market Impact continued | FRx Poised to Permeate Many More General Ledgers
Part Two: Market Impact | FRx Poised To Permeate Many More General Ledgers
Part One: Executive Summary | Financial Reporting, Planning, and Budgeting As Necessary Pieces of EPM
Part Two: Challenges and User Recommendations | Financial Reporting, Planning, and Budgeting As Necessary Pieces of EPM
Part One: Executive Summary | Be Bold with Benefits but Subtle with Pains | Evaluating Enterprise Software-Business Process or Feature/Function-Based Approach? All the above, Perhaps?
Part Three: Knowledge Bases and User Recommendations | Evaluating Enterprise Software - Business Process or Feature/Function-Based Approach? All the above, Perhaps?
Part Two | Evaluating Enterprise Software - Business Process or Feature/Function-Based Approach? All the above, Perhaps? | Has Consolidation Made the PLM Market More Agile?
Part Three: Challenges and User Recommendations | Has Consolidation Made the PLM Market More Agile?
Part Two: Market Impact | Has Consolidation Made the PLM Market More Agile? | Audit Considerations for Enterprise Software Implementations
Part 2: Applying Controls and Audit Emphasis | Audit Considerations for Enterprise Software Implementations
Part 1: Project Planning and Management | The Different Evolutionary Stages of ERP and PLM | Trends Affecting Manufacturers and ERP
Part Three: Four More Trends | Living And Thriving With Channel Master Customers | If Software Is A Commodity - Can You Still Win Some Competitive Advantage? | Customization Drives Complexity - Why It's Hard to Design, Sell, and Produce "Simple" Products | The Power of One | Product Configurators Pave the Way for Mass Customization | Has The BI Market Consolidation Been Crystal-Clearly Actuated?
Part Three: Competition and User Recommendations. | Geac Gets Its Commonsense Share Of Consolidation, With Revolving Door CEOs No Less
Part Three: Challenges and User Recommendations | Geac Gets Its Commonsense Share Of Consolidation, With Revolving Door CEOs No Less
Part Two: Market Impact | Geac Gets Its Commonsense Share Of Consolidation, With Revolving Door CEOs No Less | Best of Breed Versus Fully Integrated Software: The Pro's and Con's | Commodity Software, Best Practice and Competitive Advantage | Can ERP Speak PLM?
Part Two: Examples and Recommendations | If Software Is A Commodity...Then What? | Analyse This | Examples Of How Some Mid-Market Vendors Might Remain Within The Future Three (Dozen)?
Part Three: Made2Manage Market Impact and User Recommendations | Examples Of How Some Mid-Market Vendors Might Remain Within The Future Three (Dozen)?
Part Two: Agilisys Market Impact | Examples Of How Some Mid-Market Vendors Might Remain Within The Future Three (Dozen)? | Computerized Maintenance Management Systems: A Tutorial
Part Two: Benefits and Interfaces | Computerized Maintenance Management Systems: A Tutorial
Part One: Challenges and Features | Desktop Management's Dirty Little Secret | The Total EAM Vision Strategic Advantages in Asset Management | Software Selection: An Approach | What's Wrong With Enterprise Applications, And What Are Vendors Doing About It?
Part Three: A New Approach and User Recommendations | What's Wrong With Enterprise Applications, And What Are Vendors Doing About It?
Part Two: A New Framework Strategy | What's Wrong With Enterprise Applications, And What Are Vendors Doing About It? | Frantic Merger-Mania Spiced Up With Vendettas Leaves Customers Anxious
Part Two: Analysis Continued | ERP and WMS Co-Existence: When System Worlds Collide | Software Giants Make Courting A Small Guy Their "Business One" Priority
Part Four: Challenges and User Recommendations | Software Giants Make Courting A Small Guy Their "Business One" Priority
Part Three: Market Impact Continued | Software Giants Make Courting A Small Guy Their "Business One" Priority
Part Two: Market Impact | Software Giants Make Courting A Small Guy Their "Business One" Priority | A User Centric WorkWise Customer Conference | What You Should Know Before Selecting a WMS | Selecting PLM Software Solutions
Part 5 - User Recommendations | Selecting PLM Software Solutions
Part 4 - Comparing 3 Vendors | Selecting PLM Software Solutions Vendors
Part 3 - A Timesaving Solution | Selecting PLM Software Solutions
Part 2 - Problem Overview | Selecting PLM Software Solutions | Tier 3 And Tier 4 ... Where Do You Go If You Don't Know, What You Don't Know. | Invensys Production Solutions - Can Historic Strengths And The 'Protean Boost' Overcome Its Liabilities?
Part Two: Liabilities, Strategy, and User Recommendations | Invensys Production Solutions - Can Historic Strengths And The 'Protean Boost' Overcome Its Liabilities? | What Does Vendor Consolidation Mean To The End User? | The Reinvention of Software Vendors and End-User Value | Can ERP Meet Your eBusiness Needs?
Part Three: The Effect of eBusiness on Your Business | Can ERP Meet Your eBusiness Needs?
Part Two: ERP is the Foundation | Can ERP Meet Your eBusiness Needs? | Inventory Planning & Optimization:
Extending Your ERP System
Part Three: Business Case for Inventory Optimization Solutions | Inventory Planning & Optimization:
Extending Your ERP System
Part Two: How It Works | Inventory Planning & Optimization:
Extending Your ERP System | CMMS Templates for Effective Implementations
Part Two: The CMMS Industry and ERP | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part Five: User Recommendations | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part Four: Challenges | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part Three: Market Impact | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part Two: Geac & Baan | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part One: Ross Systems & SSA Global Technologies | Caution! Will A Traditional ERP System Help You Deliver Projects? | Will A Big Fish's Splash Cause Minnows' Flush Out Of The CRM Pond?
Part Two: Challenges and User Recommendations | Will A Big Fish's Splash Cause Minnows' Flush Out Of The CRM Pond? | Top 10 Reasons For Having A Project Kickoff - Part II | Top 10 Reasons For Having A Project Kickoff - Part I | The Art Of Distributed Development Of
Multi-Lingual Three-Tier Internet Applications | Requirements Definition For Package Implementations | Evaluating Alternatives:
Key Questions To Ask When Considering An Alternative ERP/MRP System | Rapid Prototyping Or Simply Over-hyping | How Much Wisdom Will BRAIN Bring To Agilisys?
Part 2: Challenges and User Recommendations | How Much Wisdom Will BRAIN Bring To Agilisys? | Why Systems Fail - The Dead-end of Dirty Data | PowerCerv Finally Overpowered By The '02 Hurricane Season
Part 2: Strengths and User Recommendations | PowerCerv Finally Overpowered By The '02 Hurricane Season | Data Conversion in an ERP Environment | Agilisys Continues Agilely Post-SCT
Part 3: Challenges and User Recommendations | Agilisys Continues Agilely Post-SCT
Part 2: Market Impact | Agilisys Continues Agilely Post-SCT | Fourth Shift's evolution Within SoftBrands' DemandStream
Part 2: Challenges and User Recommendations | Fourth Shift's evolution Within SoftBrands' DemandStream | Software Piloting: How Do You Fly This Plane | Geac Hopes To See System21 Shine Again Like 'Aurora'
Part 3: Challenges and User Recommendations | Geac Hopes To See System21 Shine Again Like 'Aurora'
Part 2: Market Impact | Geac Hopes To See System21 Shine Again Like 'Aurora' | Enterprise Applications Battlefield Mid-Year Scoreboard
Part 4: Other Vendors, CRM, SCP & User Recommendations | Enterprise Applications Battlefield Mid-Year Scoreboard
Part 3: IBM | Enterprise Applications Battlefield Mid-Year Scoreboard
Part 2: Microsoft | Enterprise Applications Battlefield Mid-Year Scoreboard | Beware of Legacy Data - It Can Be Lethal | Adonix Grows Roots Against The Odds
Part 2: Challenges and User Recommendations | Adonix Grows Roots Against The Odds
Part 1 | The Automotive OEMs Might Soon Contract “BRAIN” Damage Part 2: The Future and User Recommendations | The Automotive OEMs Might Soon Contract “BRAIN” Damage Part I | Scala Shows Far More Than A Bit Of A Backbone
Part 3: Challenges and User Recommendations | Scala Shows Far More Than A Bit Of A Backbone
Part 2: Market Impact | Scala Shows Far More Than A Bit Of A Backbone Part 1 | Two Highly Focused Vendors Team For Their Markets' Good | Integration is the Name of the Game in Software Systems | SalesLogix and ACT! Officially Branded As Best Software
Part 2: Challenges and User Recommendations | SalesLogix and ACT! Officially Branded As Best Software | Can 'Intuitive' And 'ERP' Words Be Associated? | The 'Joy' Of Enterprise Systems Implementations
Part 4: User Recommendations | The 'Joy' Of Enterprise Systems Implementations
Part 3: Causes of Failures | The 'Joy' Of Enterprise Systems Implementations
Part 2: Implementation Key Success Factors | The 'Joy' Of Enterprise Systems Implementations
Part 1: Inexorable Statistics | Fast-path Implementations - Are They Good or Bad? | Announcing Agilisys (Formerly SCT’s Process Manufacturing & Distribution Business) - Finally Fully Focused On Process Manufacturing | Datatex and Dan River Apparel Fabrics - Ten Years and Counting | Is Enterprise Market Consolidating? Exactly! | The Old ERP Dilemma - Should We Install The New Release? | Manugistics Indulges In The Open M&A Season.
Part 2: Market Impact, Challenges, and User Recommendations | Manugistics Indulges In The Open M&A Season | Standardizing on One ERP System in a Multi-division Enterprise | Infinium Returns To Its Core Competencies To Succeed
Part 1: Recent Announcements | Microsoft 'The Great' Poised To Conquer Mid-Market, Once and Again
Part 2: Challenges and User Recommendations | Microsoft 'The Great' Poised To Conquer Mid-Market, Once and Again
Part 1: Recent Acquisition Announcement | Siebel Rallies Its Integration Alliance Troops
Part 2: Market Impact | INFIMACS Boasts MRP Relevant To MROs | Siebel Rallies Its Integration Alliance Troops
Part 1: Recent Announcements | Lawson Enforces Its Stronghold
Part 2: Market Impact | Lawson Enforces Its Stronghold
Part1: Recent Announcements | iProcess.sct Enters Golden Gate Opportunity | Mid-Market ERP Vendors Doing CRM & SCM In A DIY Fashion
Part 2: Market Impact | Mid-Market ERP Vendors Doing CRM & SCM In A DIY Fashion
Part 1: Recent Announcements | Your ERP System is Up and Running-Now What? | Stratyc's Laser-Sharp Focused Tools Retrofit Legacy Systems | Adonix Expands X3 And Its "French Connection"
Part 2: The Future | Baan Resurrects Multi-Dimensionally
Part 4: Challenges & User Recommendations | Baan Resurrects Multi-Dimensionally
Part 3: Market Impact | Ross Systems – A Bright Spot On A Difficult Enterprise Application Landscape | PeopleSoft's Buying Momentum Goes On.
Pageant Participants, Line Up Please!
Part 2: User Recommendations | PeopleSoft's Buying Momentum Goes On.
Pageant Participants, Line Up Please!
Part 1: Market Impact | Feds Buckle Down on Customer Information Security | The Old ERP Dilemma: How Long Should You Pay Maintenance? | Made2Manage Offers New Functionality And A VIP Treatment
Part 2: Market Impact | Made2Manage Offers New Functionality And A VIP Treatment
Part 1: Announcements | Gosh, They Kill Partnerships, Don't They? | The 'Old ERP' Dilemma: Replace or Add-on | J.D. Edwards' CEO Retires Again; This Time For Good? | Lawson Software Braves IPO And Reports Strongly Against The Odds | PSI AG To Become More Germane Globally Via Relevant Partnership | J.D. Edwards On The Mend; This Time Might Be For Real | PipeChain Adds Pragmatism Onto Simplicity | Besieged By The CRM Throne Aspirants, King Siebel Delivers "The Magic No.7"
Part 2: Market Impact | How Some ERP Vendors Demonstrated - Warts And All
Part 2: Results | How Some ERP Vendors Demonstrated - Warts and All
Part 1 | Should interBiz Mean Intelligence And Prediction Beyond ERP? - Part 2: Challenges and Market Impact | Is SCT And Logistics.com Partnership A Déjà vu? | Should interBiz Mean Intelligence And Prediction Beyond ERP? | Navision Enhances Its e-Vision And Looks To Expand Vertically - Part 3: Challenges & User Recommendations | Navision Enhances Its e-Vision And Looks To Expand Vertically - Part 2: Market Impact | Navision Enhances Its e-Vision And Looks To Expand Vertically | 'Collaborative Commerce': ERP, CRM, e-Proc, and SCM Unite! A Series Study: PeopleSoft | ERP Selection Facts and Figures Case Study - Part 2: Qualitative Assessments and Analysis | ERP Selection Facts and Figures Case Study
Part 1: Business Model Scenarios | Soft Economy Dents SAP’s Armored Shield As Well | PRISM Users Get A Dedicated, Independent Web Community | Geac Awakens On Its Deathbed - Part 2: Geac's Response | What's With Oracle's And SAP's Differing Clairvoyance? | Geac Awakens On Its Deathbed - Part 1: Event Summary | The ERP Market 2001 And Beyond – Part 5: Recommendations | The ERP Market 2001 And Beyond – Part 4: Market Predictions | The ERP Market 2001 And Beyond – Part 3: Rating The Vendors | The ERP Market 2001 And Beyond – Part 2: Vendor Reactions | The ERP Market 2001 And Beyond – Aging Gracefully With The ‘New Kids On The Block’ | Shall Bifurcated Tack Reverse J.D. Edwards’ Bad Spell? | E-Business Sell Side Success at H.B. Fuller | Business Intelligence Success at Biomet, Inc. | Sausage Producer Packs Out the Profit with Technology | Intentia’s Intents To Be More Fashionable | 'Collaborative Commerce': ERP, CRM, e-Proc, and SCM Unite! A Series Study: J.D. Edwards | E-Business Customer Service Success at H.B. Fuller Company | SCT Extends Into Business Intelligence | ERP Trivia - Every Why Should Have Its Wherefore
Part 2: ERP Key Success Factors | ERP Trivia - Every Why Should Have Its Wherefore
Part 1: ERP Trends | Single Source or Best of Breed - The Debate Continues | Can You Add New Life To an Old ERP System? | Lawson Software Means Business With PSA and IPO | NavisionDamgaard Reverts To Navision, But In Name Only | J.D. Edwards' QUEST To End Its String Of Pyrrhic Victories
Part 2: The Implications | J.D. Edwards' QUEST To End Its String Of Pyrrhic Victories
Part 1: The News | PeopleSoft: Giving Fervent Hope To The Market And Jitters To The Competition. Part 2: The Implications | PeopleSoft: Giving Fervent Hope To The Market And Jitters To The Competition. Part 1: The News | ERP Selection Case Study Audio Conference Transcript | Fed Gives ERP A Shot In The Arm | IFS' Tamed Growth + Continued Losses + Increased Competitors' Lobby Talk = Decreased Customer Confidence | Latest Development on Epicor's Trying The Divestiture Tack | Is Ross Systems Up To A Hat Trick? | The Mid-Market Is Consolidating, Lo And Behold | Where Is ERP Headed (Or Better, Where Should It Be Headed)?
Part 4: ASP’s and New Pricing Models | Where Is ERP Headed (Or Better, Where Should It Be Headed)?
Part 3: E-Business and Mid-Market Shakeout | Geac Decomposes To Survive | Where Is ERP Headed (Or Better, Where Should It Be Headed)?
Part 2: Product Architecture and Web-Basing | Where Is ERP Headed (Or Better, Where Should It Be Headed)? Part 1: Functional Scope and Vertical Focus | Stalled Navision + Mixed Bag Damgaard = Satisfactory NavisionDamgaard | Small ERP Vendors Missing The ASP Boat | ERP Beginner's Guide In So Many Words | Will 2001 Be The Year Of Baan’s Miraculous Comeback?
Definitely Maybe. | SCT Corporation: The Last Viable Process Manufacturing Vendor Standing? | QAD’s Costly eTransition Continues | Does NavisionDamgaard Merger Mark Further Mid-Market Consolidation? | Essential ERP - Its Functional Scope | Symix Starts New Year Under New Name, But Old Issues Remain | What On Earth Is Going On With SSA? | BEA Systems Has A Broad Vision For E-Business Infrastructures | Big ERP Players Courting Government Agencies | Infrastructure Management Wunderkind Divides And Integrates | Geac Lives By Acquisitions; Will It Die By An Acquisition? | Lawson Software Expands Vertically As Well | Great Plains’ Latest Product Offering Ready to Stampede the SME Market? | Great Plains' eEnterprise Solution 'N Sync with Microsoft's New Platforms | Navision Executes At a Slower Pace | Symix Systems Front-Steps Into Greener e-Commerce Pastures | Has SAP Found Magic Formula (One) To Learn The Ropes Of Marketing? | Is Baan Showing Signs of Life After Death? | Oracle – How to Disappoint Analysts by Doubling Profits | Ross Systems Ends Year On a Sour Note and Braces Itself For Survivor’s Game | Will Oracle’s Freebie Shot Hurt (Or Only Graze) Siebel? | Great Plains – An SME Market Leader, But At What Cost? | IFS Marches On, Although With a String of Losses | Siebel: Great Plans for Great Plains | Commerce One Holds Announcement Festival | Fourth Shift Corporation: Working Overtime To Provide Complete Customer Care | SynQuest Posts Mixed Results | J.D. Edwards’ Mixed Blessings | Tired Of Losing Your Oil Derricks? | QAD Continues to Wade Through Red Ink | eConnections Expands Web With IPNet | Geac Trying Its Luck in Partnering | Ultimate Connection Seeking Its US Retail Connection Through Solomon Software Partners | New Release For Ariba’s Software | Thru-Put Announces Features For New APS Release | Oracle Applications - An Internet-Reinvented Feisty Challenger | American Software Has Been Starving While Delivering Innovations | Intentia Has Been Bleeding For Its Platform Independence | ERP Belle Époque Officially Ended With the Demise of Baan and SSA | PowerCerv Facing Another Stormy Season | The Pros and Cons of Collaborative Planning | MAPICS Back On Track, But Not Without Restructuring Pains | Global Vendor Negotiation Strategies | Winner Takes All – Siebel Ousts SalesLogix From Solomon’s Deal | PeopleSoft 8 Launched – Anything to Write Home About? | PeopleSoft: No More a Humble Kid From a Rough Neighborhood? | IBM Nabs Another Application Vendor | Epicor Software Corp.: How Far From Being 'One-Stop' Shop? | Peregrine Welcomes Loran to Its Nest In Network Management Matrimony | SCT Comes Back With a Vengeance | Lawson Software Marches Over $300M Milestone | SAP Remains Solid While Transitioning | They Can Run, But You Can’t Hide | How Has Made2Manage Systems Been Managing Itself? | Baan Defectors – Is This Only Tip of an Iceberg? | Is Fourth Shift Succeeding in Providing 'Complete Customer Care'? | SAP - A Leader Under Reconstruction | How Detrimental Can a 2nd-In-Charge’s Departure Be? | Can Geac Reshuffle the ERP Standings? | ERP Getting a New Breath of Fresh Air in Europe | Has Market Been Too Harsh On Great Plains? | J.D. Edwards Chooses Freedom to Choose EAI | Siebel Has Done It Again – This Time with Navision | American Software - A Tacit Avant-Garde? | Ross Systems, Inc.: In Process of Renaissance | How Has MAPICS Been Extending? | PeopleSoft Manufacturing - This Time For Sure?! | i2 Technologies’ Latest Offering: J. D. Edwards OneWorld™ | Intraware Acquires Janus for its Extranets | SAP to Become Leaner, Meaner and More Organized | J. D. Edwards FOCUSes on Active Supply Chain | Infinium Software, Inc.: Having All the Right Cards? | Access Commerce Spices Up North American CRM Fray | No More Mr. Nice Guy With J.D. Edwards | Enterprise Resource Planning Systems Audio Conference | IFS Far Cry From Running Out of Breath | Peregrine Exits Quiet Period Making Noise | ROI Systems, Inc.: Will Slow and Steady Remain in the Race? | Baan Yet Another ERP Vendor to Find a Sanctuary Under Invensys’ Wing | MAPICS Red Ink Stained While Extending Its Offering | Intentia’s Growing Pains | Ross Systems’ Renaissance Yet to Happen | Epicor Continues To Bleed | Symix Systems’ Slips Into Red During Its E-Commerce Transition | Should PeopleSoft be Overly Happy? | E&Y+ASP=BSP: It’s Not Algebra, But It Adds Up To Something Big | Will Solomon Finally Satisfy Great Plains’ Insatiable Appetite? | Baan Sinks Deeper into Red Quicksand | Lawson Software’s CRM and ASP Moves – Wise, Bold, Injudicious, Enforced, or Something Else? | Is SAP Stumbling? Perhaps. | Yet Another ‘Big 5 ERP’ CEO Casualty | Navision Software a/s: Mid-market iNvasion | Essential ERP – Current Market Trends – Part II | Will That Wretched ERP Finally Die? Possibly, But Only the Acronym! | Yet Another ERP/CRM Partnership | Oracle Flying High on Q3 Report: Is Gold All That Glitters? | Navision Becoming More Visible | Geac Announces Q3 Results and Acquires CRM Vendor | ERP Demand Being Re-heated | Concur eWorkplace Projects Vision Onto Desktop | ERP Vendors Venturing into PSA | Solomon Software: Breaking Away from Perception as “Best-of-Breed-Accounting” Vendor | JD Edwards’ Alliances: Is It Too Much of a Good Thing? | GLOVIA to be Resuscitated (Hopefully) | JD Edwards Reports Strong License Revenue Growth in Q1 2000, but… | Intentia Attempts to Become ‘Lean and Mean’ | Vendors Begin to Round Out Their CRM Suites | J.D. Edwards Names SynQuest Preferred Solution | Oracle Integrates Front and Back Office with Applications 11i | PeopleSoft's CEO Steps Down | SSA Seeks Support from Synquest | SAP sets up Apparel and Footwear team | Geac and JBA Join Forces to Form New ERP Giant | Computer Associates, Baan Japan and EXE Announce Strategic Alliance to Provide Total Supply Chain Management Solutions | Oracle to Enlist BPA Systems in its Mid-Market Quest | SAP Lowers Revenue Expectations | Symix Maintains Consistent Profitability Despite Y2K Market Conditions | Software Leasing Trend Slams Baan Earnings | Intentia Americas Gains Momentum with 10 New Deals Inked During Last Two Weeks | MAPICS Reports Solid Profitability Despite Dismal Fiscal 1999 4% Growth | Baan Releases New Supply Chain Products | French Government awards ERP contract to Peoplesoft | Business Software Firms Sued Over Implementation - Lawsuits Bring ERP Problems to Light | Geac Metamorphosises JBA Into Gear, but Cuts 20% of Staff | J.D. Edwards Incurs Further Losses In Third Quarter | Intentia and Dash Associates Team Up | Key Product Delays Take a Toll on Oracle Users | ERP Packages For Midsize Firms in the Works | QAD Reports Third-Quarter--Revenue Rises 56 Percent | Pronto ERP 'Coming to America' | System Software Associates Announces Fiscal Fourth Quarter Results - The Agony Continues | Boeing Expands Baan Licensing Deal | Oracle Reports Strong Profits | QAD Offers Improved E-Commerce Applications with Greater Flexibility and Customization Capabilities | Heads Roll at Consulting Giant in Wake of SEC Investigation | Is Baan Clinically Dead? | Manhattan Associates Partners with Intentia | PeopleSoft Completes Acquisition of Vantive; Vantive CRM Applications Integrate with PeopleSoft and Other ERP Systems | SAP, PeopleSoft Earnings Look Brighter; ERP Strikes Back | Great Plains on a Shopping Spree | Geac Upgrades Accounting And Human-Resources Apps -- SQL Release 6.0 Simplifies Purchasing And HR Services For Midsize Companies | MAPICS, Inc. to Acquire Pivotpoint, Expanding e-business Offerings for Mid-Sized Manufacturing Establishments | PeopleSoft Takes Aim at Foods Industry | ERP Vendors Moving to Aerospace and Defense Markets | PeopleSoft Recuperating Slowly, Hoping to Sink 1999 into Oblivion Quickly | Baan Posts $236 Million Loss and Sells Off Coda for Nearly $40M Less Than It Paid | Symix Expands Its Product Offering While Remaining Profitable | IFS Continues to Blossom | SAP Declares Victory Over Manugistics, Takes Aim at i2 | Food Producer Files $20m Lawsuit Against Oracle | Oracle Loses Again | PeopleSoft Programs Cause Headaches at Number of Universities | Hummingbird Announces Extraction and Portal Strategy for ERP | SAP Posts Solid Q499, but Warns of Q100 | Analysis of Lawson Delivering New Retail Analytic Capabilities | Acta Technology Helps Add Business Intelligence Capabilities to Major ERP Vendors | ERP Vendor Lawson Software Extends to IBM's DB2 Universal Database | J.D. Edwards Teams with FRx Software to Improve Reporting Solutions | SAP and HP on the Web Together | Analysis of SAS Institute and IBM Intelligence Alliance | E-Commerce Lesson: Success Gets a Yawn, Failure Takes a Beating | SAP's New Level of e-Commerce: mySAP.com | The First Step in mySAP.com | BAAN Announces "Open World": Business-To-Business Collaboration Over The Internet | With New Clothes and Hairdo, Clarus Asks for Pin Money | Lawson Plays Well With Others | The "S" in SAP Doesn't Stand for Security (that goes for PeopleSoft too) | Oracle Co. - Internet Paradigm Boosts Applications Growth | J.D. Edwards and Numetrix Ponder the Future as One | Symix Sytems: Shifting SME's Focus to Their Customers | MAPICS: Will Customer Satisfaction be Enough? | Intentia: Java Evolution From AS/400 | SSA: Evolving into systems integrator to survive | JBA: Will it remain "@ctive Enterprise"? | Marcam Solutions: Shifting its Focus to MES | Industrial & Financial Systems, IFS AB: Thriving on Product Flexibility and Incremental Deployability | Enterprise Resources Planning (ERP) Market - Dismal 1999, the New Millennium to bring Relief (for Some) | Lawson Software: Self-Evidently Thriving on Innovations | QAD Inc.: The Art of Vertical Focus | Great Plains: Strong Channel and Microsoft focus for Dynamic(s) Growth | SAP's Dr. Peter Barth on Client/Server and Database Issues with SAP R/3 | Baan E-Commerce: a Wing, a Prayer & a Single Platform | Concur Aims To Be Single Point Of (Purchasing) Access | J.D. Edwards - Creating OneWorld of Mid-sized ERP Users | Q: Who Wants to Marry a Multi-Billionaire? A: Baan -- Foster Care for Its Orphans Needed As Well | Geac Computer Corporation: Mastering Growth by Acquisitions |