A company acquires software to solve a business problem or gain a competitive advantage. A package solution is most often considered, in order to avoid the "reinventing the wheel" syndrome, and to leverage the experience and expertise of others. A package solution presupposes that the software vendor will keep current with the latest technology improvements in hardware and operating systems, and ensure that current trends in the industry are reflected and supported by the package. However, a company does not obtain these benefits through osmosis, mental telepathy, or the laying on of hands. These benefits are in the form of software releases, service packs, and patches. A company electing not to deploy these vendor offerings may find itself on an island of software isolation, or in an unsupported wasteland. This research note looks into the thought process that typically goes into the decision to upgrade, not to upgrade, or to skip over new releases.
Before getting into the upgrade discussion, certain terms need to be defined. As illustrated in the upgrade hierarchy pyramid, a new release typically offers new functionality (such as web-enabled components, radio frequency identification [RFID] support, or service-oriented architecture [SOA]); provides new data elements and data capture (as in drug pedigrees or bio-terrorism awareness); or takes advantage of hardware and software technology (for instance, blade servers, or the Linux operating system). Typically, a new release will require piloting and testing, user training, and data conversion. A service pack, on the other hand, is intended to correct inherent bugs in the vendor's software. As such, new data elements are not introduced, and extensive testing should not be required. Let's face it: the vendor is supposed to be correcting existing problems, not introducing new ones. A patch is a more localized fix or upgrade, and like service packs, should be transparent to the user community. A pyramid is an appropriate figure for representing the upgrade hierarchy, since new releases can include past service packs and patches, and likewise, service packs can include patches. Our discussion will center on new releases and service packs, with patches being included under the latter umbrella.

Setting Expectations Beforehand
Being on the project manager side of the table and typically representing the information technology (IT) factions, the user is not adequately prepared for new releases. Enterprise resource planning (ERP) implementation projects can last from nine to twelve months. You probably know of projects that have gone on for years. During the project, many users pull double duty. While undergoing training, entering data and creating tables, and piloting the new software, users must still accomplish their normal 9 A.M. to 5 P.M. responsibilities. But they perform this work because they have been told that the ERP software can provide a competitive advantage—bring in new customers, increase order sizes, reduce manufacturing inefficiencies, speed up deliveries, and so on. We have all "drunk the same Kool-Aid" and bought into this line of thinking.
The problem is that, while in the midst of a nine-month ERP project, new releases are rolling off developers' workstations. So just when you thought it was safe to return to your normal job, you are told to get ready for the new release. Too often users are led to believe that implementation is a one-time event. Nothing could be further from the truth. An ERP project is never totally completed.
The user community must be made to understand this fact of life. While this will not immediately put smiles on their faces, at least they will not feel misled. If said often enough by the right company executives, over time users accept the fact, perhaps begrudgingly. Some organizations even create smaller subsets of the implementation team that remain in place to handle new releases. Just make sure these new personnel costs are accurately reflected in the cost justification process.
Upgrading Rationale
The most obvious answer to the upgrade dilemma is that if you've already paid for the new release, why not use it? You do the math. ERP software selling conservatively for $250,000 comes with an annual maintenance price tag of $50,000 to $60,000. If you don't upgrade, you may be throwing money down the software drain. Now let's look at some the less obvious considerations.
Service Packs
The decision to apply service packs should be fairly simple if you've picked a software vendor with an effective quality assurance program. Service packs are targeted at fixing software problems by modifying code. As such, testing should be minimal, and training may not even be required. The only possible flaw or monkey wrench in this thought process is if the package has been heavily modified or enhanced.
In the case of enhancements, first you must determine if the service pack impacts the enhancements. Secondly, you must retrofit the enhancements over the service pack. Testing should no longer be considered minimal. Testing must ensure that the enhancements works as intended, and that they do not negate the service pack fix. A rule of thumb: for each service pack, budget 20 percent of the original cost of the enhancement for retrofitting. So for an enhancement that was initially installed for $50,000 (and assuming four service packs are issued during the year—not an unreasonable release rate for some vendors), you are looking at a cost of $40,000. This figure does not take into consideration the time of company employees involved in testing. While chief executive officers (CEOs) like to cater to the needs of their users and bring the software beast into line, many fail to foresee future repercussions.
New Releases
The decision to implement a new release of a package is much more complicated, due to higher costs and a longer timeline. To a large extent, new releases should be treated as new implementations, to include data conversion, pilot testing, integrated testing, and user acceptance. Unless there are significant changes in functionality, the as is, to be, and gap analysis phases should not be required. Having navigated through the learning curve once, users should need less training than in the initial implementation.
This being said, at the high end, implementing a new release should be budgeted at 50 percent of the original project. If major enhancements have been made to the baseline software, the estimate could increase to 70 percent or more, as all of the enhancements have to be retrofitted to the new release and tested.
New releases, however, are not like new models of cars, where you want to be the first on the block to have one. Unless there is an overwhelming need for functionality or unless the vendor has committed to a major enhancement as part of the sales agreement, most companies will remain one release behind. No one wants to be on the bleeding edge of technology or become a test subject for new functionality. A good rule of thumb for companies who want to deploy the current release is to wait until after the first service pack of the software is issued. Even after a new release is made available, vendor testing continues. While not showing a high degree of confidence in the software developers, this plan of action is based on the state of software development and the typical vendor rush to market.
Continuing Maintenance
No discussion on upgrading to a new release would be complete without some mention of ongoing maintenance and related fees. Consider that, for valid reasons, your company continually passes on implementing new releases. You need to ask yourself, "Why stay on maintenance?" Companies should debate this question each time a decision is made not to implement a new release, even after several service packs are issued. For large companies with adequate IT resources, access to the source code, and knowledge in the use of development tools, a logical answer could be to drop maintenance. Keep in mind that even with these advantages, such matters as proprietary fourth-generation languages and database technologies can present obstacles to a goal of self-sufficiency.
Small and medium enterprises (SMEs) typically do not have these advantages. Furthermore, SMEs are often told by the package vendors that they do not need an IT staff ("We'll be your IT staff"). Assuming that SMEs stay on the straight and narrow path outlined by the vendor, this can be true. But this allegiance requires annual payment for maintenance and support. Consequently, going off maintenance can be a much more gut-wrenching decision for SMEs. Ignoring the fact that new functionality will be unlikely, managing the technological environment could be an even greater concern. While some SMEs may look at a maintenance license as an insurance policy, a more realistic view may be to see it as a warranty. An insurance policy can give you money for your pain and suffering. A warranty includes parts and labor from a knowledgeable source. Without a warranty, you must either constantly negotiate a time and material deal with the software vendor, or find a third party outlet. Depending on the popularity of your package, this latter option could be extremely difficult.
Rationale for Skipping Over Releases
Companies may defer implementing a new release of an ERP package if no new, perceived functionality is being provided. This deference may go through several releases. For example, a company may still be on release 1.0 when release 4.0 (three releases removed) becomes available. A common and contractual practice among software vendors is to support the current release, and the previous release. For our example company, release 1.0 is no longer supported. Further compounding the problem is that our hypothetical company is probably still paying maintenance, yet not taking advantage of it.
Skipping releases can be a Catch-22. Companies think that by skipping a release, they are saving themselves the time, expense, and aggravation of an implementation project. This is probably not the case. As stated above, new releases include new data elements and new functionality. A company would have to run the conversion routines to go from release 1.0 to release 2.0, from release 2.0 to release 3.0, and so on. The jobs have to set up, tested, and run. There are no time savings here. New functionality still has to piloted, tested, and verified. When catchweight (pricing meat and poultry, for example, by actual weight, not container size) was introduced for the food industry, many vendors implemented this functionality in phases in their rush to market. The first phase (probably in release 2.0 for our example) was to capture catchweight as new data element. The second phase (release 3.0) was to incorporate catchweight in the cost accounting routines for production material. The final phase—release 4.0—was to incorporate the supply chain links. In our food industry example, it would be extremely prudent to verify the accuracy of catchweight in each release, since heavy reliance and forecasting decisions would be placed on this new functionality. Again, there are no time savings here. Similar arguments could be made for enhancements and technology changes.
Surely certain phases, particularly training, can be eliminated or significantly reduced. However, a company would be concentrating significant manpower for a prolonged period of time by dealing simultaneously with multiple releases. There may be overwhelming factors, such as new product development or advanced marketing programs, that fall outside the bounds of an ERP package. These factors may necessitate a delay in implementing a new release. However, foregoing these factors, the tradeoffs offered by skipping new releases do not warrant this tactical approach.
Findings and Recommendations
When undertaking the purchase and implementation of enterprise-wide package solutions, the project extends well beyond the go-live date. Even if the initial implementation takes nine months, a company needs to commit to personnel and project plans stretching several years into the future.
Assuming that enhancements are non-existent or minor, service packs should be dealt with as they are released. Companies should be able to install service packs with minimal testing and user training. Service packs should fix problems, not create new ones. If this is not the case, companies should seriously consider what the annual maintenance fees are for, and have a heart-to-heart meeting with their software vendors. If enhancements are significant, they might want to question their choice of software package. Furthermore, the degree of difficulty and amount of time for implementing service packs under this scenario will be more closely aligned with that of new releases.
By their nature and scope, an implementation of a new release involves a more complex project, timeline, and use of resources than the service pack. Given the absence of competing and compelling business conditions, new releases should be budgeted for no more than one a year. If the rapidity of new releases is greater than one a year, the user group needs to meet with and rectify this condition with the software vendor. Companies should not be a continual state of implementation, even if they have formed a project team for this purpose. If new functionality is packaged properly, new releases can be scheduled in intervals of eighteen months, with the concurrence of the user group.
As has been discussed, skipping and combining releases may not deliver the expected benefits. Essentially, the time saved may not be significant. In addition, a project to accommodate multiple releases will have a greater degree of difficulty. This fact is illustrated in the chart below.

Managing enterprise applications and corresponding new releases is no "walk in the park." Just implementing new releases is a complex and time-consuming part of an IT department's scope of responsibilities. Many IT departments are not staffed for this scope, and forget to budget and manage for it in the future. As a result, companies are taking a strong look at outsourcing new ERP release management so they can refocus their efforts on revenue-enhancing initiatives.
As vendors have begun componentizing their software suites, the appealing paradigm of free upgrades is being revaluated. Moving away from all-inclusive suites of software, enterprise software vendors are starting to charge new license fees for the new components (or SOA functionality) as they are developed. How these components are to be integrated with existing software suites is giving chief information officers (CIOs) more gray hair (of what little they have left). Many companies cannot afford to upgrade to the newer, componentized version of the vendors' software solutions, and if they could, they would have to pay a new license fees for their difficulty. This transition may force more companies to go off maintenance, via the simple reasoning, "Why pay for something that we can never get to use?" But that's another story for another day.
The bottom line is that managing new releases and implementation of enterprise-wide software must be considered when reviewing the cost justification of the initial purchase of the software. This consideration will not necessarily alter your decision to pursue an ERP solution, but it will definitely alter the calculations of your return on investment (ROI) and payback years.
The chart below helps you gauge the level of effort required by upgrade type, and provides an overall summary of this research note. It reflects the time needed for retrofitting enhancements, since this is directly proportional to the difficulty and scope of the enhancements. The as-is, to-be, and gap analysis phases should be completed by reviewing the release notes and then making a determination if a more in-depth analysis is required.

The implementation tasks have been assigned a degree of activity of low, moderate, or high. We can make these general assignments of effort:
- Low activity requires a labor-week or less of effort.
- Moderate activity requires a half labor-month or less of effort.
- High activity requires a labor-month or more of effort.
Based on these assignments, at the low end for a service pack upgrade in an environment of no or minimal enhancement, the project can be completed in a month or less. Conversely, at the high end, for a new release in a heavily enhanced package solution, the project can take as long as four months. But remember you must add in the effort to retrofit the enhancements, which more than doubles the project timeline. Use these estimates as a guide to perform a reasonable test of your project.
Finally, some of you may say that the concepts discussed in this research note are easier said then done. We are in total agreement. However, if you set the expectations of the user community beforehand, that an enterprise-wide package implementation is not a "one and done" project, and clearly outline the pitfalls of not implementing or skipping future releases, you may find yourself closer to the desired target.
About the Authors
Joseph J. Strub has extensive experience as a senior project manager and consultant for the planning and execution of ERP projects for manufacturing and distribution systems, for large to medium companies in the retail, food and beverage, chemical, and consumer-packaged goods (CPG) process industries. He has developed marketing and communication programs for IT organizations and consulted on off-shore, outsourcing opportunities for multinational companies. Additionally, Strub was a consultant and information systems auditor with PricewaterhouseCoopers, and an applications development and support manager for several Fortune 100 companies. Currently, Strub is an independent consultant. He can be contacted at JoeStrub@WriteTechnologyPlus.com.
Predrag Jakovljevic is a principal analyst with Technology Evaluation Centers (TEC), with a focus on the enterprise applications market. He has nearly twenty years of manufacturing industry experience, including several years as a power user of IT/ERP and related applications, as well as being a consultant/implementer and market analyst. He holds a bachelor's degree in mechanical engineering from the University of Belgrade (Serbia [the former Yugoslavia]), and has also been certified in production and inventory management (CPIM) and integrated resources management (CIRM) by APICS.
Federal Contract Management and Vendors' Readiness
Part Three: Meeting Federal Requirements | Federal Contract Management and Vendors' Readiness
Part Two: Dealing With the Federal Government | Federal Contract Management and Vendors' Readiness
Part One: Entry of Small Vendors into Federal Contracts | MRO and Spare Parts Management Considerations | JDA Portfolio: For the Retail Industry
Part Six: ERP Vendors and User Recommendations | JDA Portfolio: For the Retail Industry -- Part Five: Analysis of Market Impact | JDA Portfolio: For the Retail Industry
Part Four: More JDA Portfolio 2004.1 and Microsoft Alliance | JDA Portfolio: For the Retail Industry
Part Three: JDA Portfolio 2004.1 Continued | JDA Portfolio: For The Retail Industry
Part Two: JDA Portfolio 2004.1 Components | JDA Portfolio: For the Retail Industry
Part One: Event Summary | Glossary of Enterprise Applications Terminology
Part Two: Just-in-Time to Extensible Markup Language | Glossary of Enterprise Applications Terminology
Part One: Accounts Payable Through Internet | Understanding SOA, Web Services, BPM, and BPEL
Part Two: BPEL and User Recommendations | Understanding SOA, Web Services, BPM, BPEL, and More
Part One: SOA, Web Services, and BPM | Epicor's Mid-Market Pitch Becomes Higher For (One) Scala
Part Five: More Challenges & User Recommendations |
Epicor's Mid-Market Pitch Becomes Higher For (One) Scala
Part Four: Merger Synergies and Challenges | Epicor's Mid-Market Pitch Becomes Higher For (One) Scala
Part Three: Market Impact | Epicor's Mid-Market Pitch Becomes Higher For (One) Scala
Part Two: How Scala Complements Epicor | Epicor's Mid-Market Pitch Becomes Higher For (One) Scala
Part One: Event Summary | Understand J2EE and .NET Environments Before You Choose | When Is It Time to Re-implement? | ICICI-Infotech's North American Strategy for Success
Part Three: Challenges and User Recommendations | ICICI-Infotech's North American Strategy for Success
Part Two: Customer Focus and Innovative Pricing | ICICI-Infotech's North American Strategy for Success
Part One: Company Background and Market Focus | Inovis Delves into PIM by Snatching QRS
Part Five: Challenges and User Recommendations | Inovis Delves into PIM by Snatching QRS
Part Four: Market Impact | Inovis Delves into PIM by Snatching QRS
Part Three: QRS Background | Inovis Delves into PIM by Snatching QRS
Part Two: QRS Marketing | Inovis Delves into PIM by Snatching QRS
Part One: Event Notes | Not All Acquisitions Happen: JDA and QRS
Part Two: Market Impact | Not All Acquisitions Happen: JDA and QRS
Part One: Event and Market Impact | The Name and Ownership Change Roulette Wheel for Marcam Stops at SSA Global
Part Three: Last-Ditch Effort by Invensys | The Name and Ownership Change Roulette Wheel for Marcam Stops at SSA Global
Part One: Event Summary | Master Requirement Planning and Master Production Scheduling Software: Hard Facts
Part Two: Materials Requirement Planning and Master Production Scheduling | Intentia: Stepping Out With Fashion and Style
Part Four: Movex Case Study Continued With User Recommendations | Intentia: Stepping Out With Fashion and Style
Part Three: Movex, a Case Study of Fashion Industry Software | Intentia: Stepping Out With Fashion and Style
Part Two: Software Challenges in the Fashion Industry | The Trap of Accountancy Systems; When to Move on to ERP | Fed Warms Up to ERP Spending, but Will Contractors and Their ERP Vendors Comply?
Part Two: Challenges and User Recommendations | Feds Warms Up to ERP Spending, but Will Contractors and Their ERP Vendors Comply?
Part One: Event Summary and Market Impact | Retail Market Dynamics for Software Vendors
Part Two: Progress | Retail Market Dynamics for Software Vendors
Part One: Software Requirements for Retail | TEC Talks to the Compiere ERP/CRM ProjectFree and Open Source Software Business ModelsPart Three: Compiere/ComPiere | TEC Talks to the Open For Business ProjectFree and Open Source Software Business ModelsPart One: OFBiz | Enterprise Process Improvement (EPI) Software:
Customer and Software Vendor Collaboration | PeopleSoft Revamps World for Its Mid-Market "Express" Conquest
Part Four: Challenges and User Recommendations | PeopleSoft Revamps World for Its Mid-Market "Express" Conquest
Part Three: Strengths | PeopleSoft Revamps World for Its Mid-Market "Express" Conquest
Part Two: Market Impact | PLM Coming of Age: ERP Vendors Take Notice | Future Compatible | Buy, Build, or Somewhere Between | Mid-market Getting the Taste of Some Emerging Technologies | ROI for RFID: A Case Study
Part Two: Implementation and Results | ROI for RFID: A Case Study
Part One: Company Background | Nonprofits and Public Sector: The Latest Hot Market | Intuitive Manufacturing Systems Shows Maturity in Adolescent Age
Part Four: Challenges and User Recommendations | Intuitive Manufacturing Systems Shows Maturity in Adolescent Age
Part Three: Market Impact Continued | Intuitive Manufacturing Systems Shows Maturity in Adolescent Age
Part Two: Market Impact | Intuitive Manufacturing Systems Shows Maturity in Adolescent Age
Part One: Company Overview | ERP II Demystified | Rewrite or Wrap-Around Old Software?
Part Two: Extending to the Web and Challenges | Rewrite or Wrap-Around Old Software?
Part One: Event Summary | What's Wrong With Application Software? Business Changes, Software Must Change with the Business. | Process Manufacturing: Industry Specific Requirements
Part One: Introduction | Encompix--Thriving on Encompassing Complexity
Part One: Event Summary | Leveraging Technology to Maintain a Competitive Edge During Tough Economic Times -- A Panel Discussion Analyzed
Part Six: Custom Development and Single-Vendor versus Multi-Vendor | Leveraging Technology to Maintain a Competitive Edge During Tough Economic Times -- A Panel Discussion Analyzed
Part Three: Applications Hosting | Leveraging Technology to Maintain a Competitive Edge during Tough Economic Times --A Panel Discussion Analyzed
Part One: Introduction | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part Five: Challenges and User Recommendations | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part Four: SoftBrands | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part Three: Market Impact | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part Two: SoftBrands | SoftBrands to Institute Fourth Shift for SAP Business One Manufacturing Work-Plan
Part One: Event Summary | ERP Systems and the ETO Manufacturing Market
Part Three: User Recommendations | ERP Systems and the ETO Manufacturing Market
Part Two: ETO versus Repetitive Differences | ERP Systems and the ETO Manufacturing Market
Part One: Event Summary | Catering to Small and Medium-Size Enterprises | Fatal Flaws in ERP Software Create Opportunity for Niche Software in CPG Companies | Cookie-cutter Solutions Won't Cut It with the Mid-Market
Part Two: Challenges and the Lower-End | Cookie-cutter Solutions Won't Cut It with the Mid-Market
Part One: Historical Relationships | Integrating All Information Assets
Part Four: What Approach Do You Take? | Integrating All Information Assets
Part Three: What Constitutes Integration? | Integrating All Information Assets
Part Two: Why is integration an issue? | Integrating All Information Assets
Part One: Why is integration an issue? | ERP and SCM Implementations
Part Two: Interfaces and Priorities | ERP and SCM Implementations
Part One: Doing Too Much Too Soon | Enterprise Applications--The Genesis and Future, Revisited
Part Six: Looking to the Future | Enterprise Applications--The Genesis and Future, Revisited
Part Five: More on ERP Evolution | Enterprise Applications--The Genesis and Future, Revisited
Part Four: Another Step in ERP Evolution | Enterprise Applications--The Genesis and Future, Revisited
Part Three: 2000s--Back to the Future | Enterprise Applications--The Genesis and Future, Revisited
Part Two: 1990s--Enterprise Resource Planning | Enterprise Applications--The Genesis and Future, Revisited
Part One: 1960s--Pre-Computer Era | The World Of Software Buying Has Changed; Will the Vendors Change With It? | BI Approaches of Enterprise Software Vendors | The Old ERP Dilemma--The Refresh Option | Exact Software--Working Diligently Towards the "One Exact" Synergy
Part Two: Macola, the ERP and BAM Solutions | Usability | Justification of ERP Investments
Part Four: Replacing or Re-implementing an ERP System | Justification of ERP Investments
Part Three: Costs of Implementing an ERP System | Justification of ERP Investments
Part Two: The Intangible Effects of ERP | Intentia's Movex for Food and Beverage: Gaining a Foothold in North America
Part Three: Observations and User Recommendations | Comparison of ERP and CRM Markets' Life cycle Snapshots | PeopleSoft Gathers Manufacturing and SCM Wherewithal
Part Three: The Manufacturing Industry | PeopleSoft Gathers Manufacturing and SCM Wherewithal
Part Two: Market Impact | PeopleSoft Gathers Manufacturing and SCM Wherewithal
Part One: Recent Anouncements | Fujitsu Poised to (Inter)Stage Glovia's Comeback
Part Four: Challenges and User Recommendations | Fujitsu Poised to (Inter)Stage Glovia's Comeback
Part Three: Market Impact | Fujitsu Poised to (Inter)Stage Glovia's Comeback
Part Two: Fujitsu's Support of Glovia | Fujitsu Poised to (Inter)Stage Glovia's Comeback
Part One: Event Summary | Pull vs Push: a Discussion of Lean, JIT, Flow, and Traditional MRP
Part Two: Challenges and User Recommendations | Pull vs Push: a Discussion of Lean, JIT, Flow, and Traditional MRP
Part 1: Tutorial | Deltek Remains the Master of Its Selected Few Domains
Part Six: Challenges and User Recommendations | Deltek Remains the Master of Its Selected Few Domains
Part Four: Deltek's Differentiators | Support for Old Releases-Good for the User but Is It Good for the Vendor? | Sales and Operations Planning
Part Three: Game Plan Guidelines | Sales and Operations Planning
Part Two: Common Scenarios | Sales and Operations Planning
Part One: Identifying and Forecasting Demand | FRx Poised to Permeate Many More General Ledgers
Part Four: Competitors and User Recommendations | FRx Poised to Permeate Many More General Ledgers
Part Three: Market Impact continued | FRx Poised to Permeate Many More General Ledgers
Part Two: Market Impact | FRx Poised To Permeate Many More General Ledgers
Part One: Executive Summary | Financial Reporting, Planning, and Budgeting As Necessary Pieces of EPM
Part Two: Challenges and User Recommendations | Financial Reporting, Planning, and Budgeting As Necessary Pieces of EPM
Part One: Executive Summary | Be Bold with Benefits but Subtle with Pains | Evaluating Enterprise Software-Business Process or Feature/Function-Based Approach? All the above, Perhaps?
Part Three: Knowledge Bases and User Recommendations | Evaluating Enterprise Software - Business Process or Feature/Function-Based Approach? All the above, Perhaps?
Part Two | Evaluating Enterprise Software - Business Process or Feature/Function-Based Approach? All the above, Perhaps? | Has Consolidation Made the PLM Market More Agile?
Part Three: Challenges and User Recommendations | Has Consolidation Made the PLM Market More Agile?
Part Two: Market Impact | Has Consolidation Made the PLM Market More Agile? | Audit Considerations for Enterprise Software Implementations
Part 2: Applying Controls and Audit Emphasis | Audit Considerations for Enterprise Software Implementations
Part 1: Project Planning and Management | The Different Evolutionary Stages of ERP and PLM | Trends Affecting Manufacturers and ERP
Part Three: Four More Trends | Living And Thriving With Channel Master Customers | If Software Is A Commodity - Can You Still Win Some Competitive Advantage? | Customization Drives Complexity - Why It's Hard to Design, Sell, and Produce "Simple" Products | The Power of One | Product Configurators Pave the Way for Mass Customization | Has The BI Market Consolidation Been Crystal-Clearly Actuated?
Part Three: Competition and User Recommendations. | Geac Gets Its Commonsense Share Of Consolidation, With Revolving Door CEOs No Less
Part Three: Challenges and User Recommendations | Geac Gets Its Commonsense Share Of Consolidation, With Revolving Door CEOs No Less
Part Two: Market Impact | Geac Gets Its Commonsense Share Of Consolidation, With Revolving Door CEOs No Less | Best of Breed Versus Fully Integrated Software: The Pro's and Con's | Commodity Software, Best Practice and Competitive Advantage | Can ERP Speak PLM?
Part Two: Examples and Recommendations | If Software Is A Commodity...Then What? | Analyse This | Examples Of How Some Mid-Market Vendors Might Remain Within The Future Three (Dozen)?
Part Three: Made2Manage Market Impact and User Recommendations | Examples Of How Some Mid-Market Vendors Might Remain Within The Future Three (Dozen)?
Part Two: Agilisys Market Impact | Examples Of How Some Mid-Market Vendors Might Remain Within The Future Three (Dozen)? | Computerized Maintenance Management Systems: A Tutorial
Part Two: Benefits and Interfaces | Computerized Maintenance Management Systems: A Tutorial
Part One: Challenges and Features | Desktop Management's Dirty Little Secret | Software Selection: An Approach | What's Wrong With Enterprise Applications, And What Are Vendors Doing About It?
Part Three: A New Approach and User Recommendations | What's Wrong With Enterprise Applications, And What Are Vendors Doing About It?
Part Two: A New Framework Strategy | What's Wrong With Enterprise Applications, And What Are Vendors Doing About It? | Frantic Merger-Mania Spiced Up With Vendettas Leaves Customers Anxious
Part Two: Analysis Continued | ERP and WMS Co-Existence: When System Worlds Collide | Software Giants Make Courting A Small Guy Their "Business One" Priority
Part Four: Challenges and User Recommendations | Software Giants Make Courting A Small Guy Their "Business One" Priority
Part Three: Market Impact Continued | Software Giants Make Courting A Small Guy Their "Business One" Priority
Part Two: Market Impact | Software Giants Make Courting A Small Guy Their "Business One" Priority | A User Centric WorkWise Customer Conference | What You Should Know Before Selecting a WMS | Selecting PLM Software Solutions
Part 5 - User Recommendations | Selecting PLM Software Solutions
Part 4 - Comparing 3 Vendors | Selecting PLM Software Solutions Vendors
Part 3 - A Timesaving Solution | Selecting PLM Software Solutions
Part 2 - Problem Overview | Selecting PLM Software Solutions | Tier 3 And Tier 4 ... Where Do You Go If You Don't Know, What You Don't Know. | Invensys Production Solutions - Can Historic Strengths And The 'Protean Boost' Overcome Its Liabilities?
Part Two: Liabilities, Strategy, and User Recommendations | Invensys Production Solutions - Can Historic Strengths And The 'Protean Boost' Overcome Its Liabilities? | What Does Vendor Consolidation Mean To The End User? | The Reinvention of Software Vendors and End-User Value | Can ERP Meet Your eBusiness Needs?
Part Three: The Effect of eBusiness on Your Business | Can ERP Meet Your eBusiness Needs?
Part Two: ERP is the Foundation | Can ERP Meet Your eBusiness Needs? | Inventory Planning & Optimization:
Extending Your ERP System
Part Three: Business Case for Inventory Optimization Solutions | Inventory Planning & Optimization:
Extending Your ERP System
Part Two: How It Works | Inventory Planning & Optimization:
Extending Your ERP System | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part Five: User Recommendations | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part Four: Challenges | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part Three: Market Impact | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part Two: Geac & Baan | Resurrection, Vitality And Perseverance Of Former ERP 'Goners'
Part One: Ross Systems & SSA Global Technologies | Caution! Will A Traditional ERP System Help You Deliver Projects? | Will A Big Fish's Splash Cause Minnows' Flush Out Of The CRM Pond?
Part Two: Challenges and User Recommendations | Will A Big Fish's Splash Cause Minnows' Flush Out Of The CRM Pond? | Top 10 Reasons For Having A Project Kickoff - Part II | Top 10 Reasons For Having A Project Kickoff - Part I | The Art Of Distributed Development Of
Multi-Lingual Three-Tier Internet Applications | Requirements Definition For Package Implementations | Evaluating Alternatives:
Key Questions To Ask When Considering An Alternative ERP/MRP System | Rapid Prototyping Or Simply Over-hyping | How Much Wisdom Will BRAIN Bring To Agilisys?
Part 2: Challenges and User Recommendations | How Much Wisdom Will BRAIN Bring To Agilisys? | Why Systems Fail - The Dead-end of Dirty Data | PowerCerv Finally Overpowered By The '02 Hurricane Season
Part 2: Strengths and User Recommendations | PowerCerv Finally Overpowered By The '02 Hurricane Season | Data Conversion in an ERP Environment | Agilisys Continues Agilely Post-SCT
Part 3: Challenges and User Recommendations | Agilisys Continues Agilely Post-SCT
Part 2: Market Impact | Agilisys Continues Agilely Post-SCT | Fourth Shift's evolution Within SoftBrands' DemandStream
Part 2: Challenges and User Recommendations | Fourth Shift's evolution Within SoftBrands' DemandStream | Software Piloting: How Do You Fly This Plane | Geac Hopes To See System21 Shine Again Like 'Aurora'
Part 3: Challenges and User Recommendations | Geac Hopes To See System21 Shine Again Like 'Aurora'
Part 2: Market Impact | Geac Hopes To See System21 Shine Again Like 'Aurora' | Enterprise Applications Battlefield Mid-Year Scoreboard
Part 4: Other Vendors, CRM, SCP & User Recommendations | Enterprise Applications Battlefield Mid-Year Scoreboard
Part 3: IBM | Enterprise Applications Battlefield Mid-Year Scoreboard
Part 2: Microsoft | Enterprise Applications Battlefield Mid-Year Scoreboard | Beware of Legacy Data - It Can Be Lethal | Adonix Grows Roots Against The Odds
Part 2: Challenges and User Recommendations | Adonix Grows Roots Against The Odds
Part 1 | The Automotive OEMs Might Soon Contract “BRAIN” Damage Part 2: The Future and User Recommendations | The Automotive OEMs Might Soon Contract “BRAIN” Damage Part I | Scala Shows Far More Than A Bit Of A Backbone
Part 3: Challenges and User Recommendations | Scala Shows Far More Than A Bit Of A Backbone
Part 2: Market Impact | Scala Shows Far More Than A Bit Of A Backbone Part 1 | Two Highly Focused Vendors Team For Their Markets' Good | Integration is the Name of the Game in Software Systems | SalesLogix and ACT! Officially Branded As Best Software
Part 2: Challenges and User Recommendations | SalesLogix and ACT! Officially Branded As Best Software | Can 'Intuitive' And 'ERP' Words Be Associated? | The 'Joy' Of Enterprise Systems Implementations
Part 4: User Recommendations | The 'Joy' Of Enterprise Systems Implementations
Part 3: Causes of Failures | The 'Joy' Of Enterprise Systems Implementations
Part 2: Implementation Key Success Factors | The 'Joy' Of Enterprise Systems Implementations
Part 1: Inexorable Statistics | Fast-path Implementations - Are They Good or Bad? | Announcing Agilisys (Formerly SCT’s Process Manufacturing & Distribution Business) - Finally Fully Focused On Process Manufacturing | Datatex and Dan River Apparel Fabrics - Ten Years and Counting | Is Enterprise Market Consolidating? Exactly! | The Old ERP Dilemma - Should We Install The New Release? | Manugistics Indulges In The Open M&A Season.
Part 2: Market Impact, Challenges, and User Recommendations | Manugistics Indulges In The Open M&A Season | Standardizing on One ERP System in a Multi-division Enterprise | Microsoft 'The Great' Poised To Conquer Mid-Market, Once and Again
Part 2: Challenges and User Recommendations | Microsoft 'The Great' Poised To Conquer Mid-Market, Once and Again
Part 1: Recent Acquisition Announcement | Siebel Rallies Its Integration Alliance Troops
Part 2: Market Impact | INFIMACS Boasts MRP Relevant To MROs | Siebel Rallies Its Integration Alliance Troops
Part 1: Recent Announcements | Lawson Enforces Its Stronghold
Part 2: Market Impact | Lawson Enforces Its Stronghold
Part1: Recent Announcements | iProcess.sct Enters Golden Gate Opportunity | Mid-Market ERP Vendors Doing CRM & SCM In A DIY Fashion
Part 2: Market Impact | Mid-Market ERP Vendors Doing CRM & SCM In A DIY Fashion
Part 1: Recent Announcements | Your ERP System is Up and Running-Now What? | Stratyc's Laser-Sharp Focused Tools Retrofit Legacy Systems | Adonix Expands X3 And Its "French Connection"
Part 2: The Future | Baan Resurrects Multi-Dimensionally
Part 4: Challenges & User Recommendations | Baan Resurrects Multi-Dimensionally
Part 3: Market Impact | Ross Systems – A Bright Spot On A Difficult Enterprise Application Landscape | PeopleSoft's Buying Momentum Goes On.
Pageant Participants, Line Up Please!
Part 2: User Recommendations | PeopleSoft's Buying Momentum Goes On.
Pageant Participants, Line Up Please!
Part 1: Market Impact | Feds Buckle Down on Customer Information Security | The Old ERP Dilemma: How Long Should You Pay Maintenance? | Made2Manage Offers New Functionality And A VIP Treatment
Part 2: Market Impact | Made2Manage Offers New Functionality And A VIP Treatment
Part 1: Announcements | Gosh, They Kill Partnerships, Don't They? | The 'Old ERP' Dilemma: Replace or Add-on | J.D. Edwards' CEO Retires Again; This Time For Good? | Lawson Software Braves IPO And Reports Strongly Against The Odds | PSI AG To Become More Germane Globally Via Relevant Partnership | J.D. Edwards On The Mend; This Time Might Be For Real | PipeChain Adds Pragmatism Onto Simplicity | Besieged By The CRM Throne Aspirants, King Siebel Delivers "The Magic No.7"
Part 2: Market Impact | How Some ERP Vendors Demonstrated - Warts And All
Part 2: Results | How Some ERP Vendors Demonstrated - Warts and All
Part 1 | Should interBiz Mean Intelligence And Prediction Beyond ERP? - Part 2: Challenges and Market Impact | Is SCT And Logistics.com Partnership A Déjà vu? | Should interBiz Mean Intelligence And Prediction Beyond ERP? | Navision Enhances Its e-Vision And Looks To Expand Vertically - Part 3: Challenges & User Recommendations | Navision Enhances Its e-Vision And Looks To Expand Vertically - Part 2: Market Impact | Navision Enhances Its e-Vision And Looks To Expand Vertically | ERP Selection Facts and Figures Case Study - Part 2: Qualitative Assessments and Analysis | ERP Selection Facts and Figures Case Study
Part 1: Business Model Scenarios | Soft Economy Dents SAP’s Armored Shield As Well | PRISM Users Get A Dedicated, Independent Web Community | Geac Awakens On Its Deathbed - Part 2: Geac's Response | What's With Oracle's And SAP's Differing Clairvoyance? | Geac Awakens On Its Deathbed - Part 1: Event Summary | The ERP Market 2001 And Beyond – Part 5: Recommendations | The ERP Market 2001 And Beyond – Part 4: Market Predictions | The ERP Market 2001 And Beyond – Part 3: Rating The Vendors | The ERP Market 2001 And Beyond – Part 2: Vendor Reactions | The ERP Market 2001 And Beyond – Aging Gracefully With The ‘New Kids On The Block’ | Shall Bifurcated Tack Reverse J.D. Edwards’ Bad Spell? | E-Business Sell Side Success at H.B. Fuller | Business Intelligence Success at Biomet, Inc. | Sausage Producer Packs Out the Profit with Technology | Intentia’s Intents To Be More Fashionable | 'Collaborative Commerce': ERP, CRM, e-Proc, and SCM Unite! A Series Study: J.D. Edwards | E-Business Customer Service Success at H.B. Fuller Company | SCT Extends Into Business Intelligence | ERP Trivia - Every Why Should Have Its Wherefore
Part 2: ERP Key Success Factors | ERP Trivia - Every Why Should Have Its Wherefore
Part 1: ERP Trends | Single Source or Best of Breed - The Debate Continues | Can You Add New Life To an Old ERP System? | Lawson Software Means Business With PSA and IPO | NavisionDamgaard Reverts To Navision, But In Name Only | J.D. Edwards' QUEST To End Its String Of Pyrrhic Victories
Part 2: The Implications | J.D. Edwards' QUEST To End Its String Of Pyrrhic Victories
Part 1: The News | PeopleSoft: Giving Fervent Hope To The Market And Jitters To The Competition. Part 2: The Implications | PeopleSoft: Giving Fervent Hope To The Market And Jitters To The Competition. Part 1: The News | ERP Selection Case Study Audio Conference Transcript | Fed Gives ERP A Shot In The Arm | IFS' Tamed Growth + Continued Losses + Increased Competitors' Lobby Talk = Decreased Customer Confidence | Latest Development on Epicor's Trying The Divestiture Tack | Is Ross Systems Up To A Hat Trick? | The Mid-Market Is Consolidating, Lo And Behold | Where Is ERP Headed (Or Better, Where Should It Be Headed)?
Part 4: ASP’s and New Pricing Models | Where Is ERP Headed (Or Better, Where Should It Be Headed)?
Part 3: E-Business and Mid-Market Shakeout | Geac Decomposes To Survive | Where Is ERP Headed (Or Better, Where Should It Be Headed)?
Part 2: Product Architecture and Web-Basing | Where Is ERP Headed (Or Better, Where Should It Be Headed)? Part 1: Functional Scope and Vertical Focus | Stalled Navision + Mixed Bag Damgaard = Satisfactory NavisionDamgaard | Small ERP Vendors Missing The ASP Boat | ERP Beginner's Guide In So Many Words | Will 2001 Be The Year Of Baan’s Miraculous Comeback?
Definitely Maybe. | SCT Corporation: The Last Viable Process Manufacturing Vendor Standing? | QAD’s Costly eTransition Continues | Does NavisionDamgaard Merger Mark Further Mid-Market Consolidation? | Essential ERP - Its Functional Scope | The Essential ERP - Its Genesis & Future | Symix Starts New Year Under New Name, But Old Issues Remain | What On Earth Is Going On With SSA? | BEA Systems Has A Broad Vision For E-Business Infrastructures | Big ERP Players Courting Government Agencies | Geac Lives By Acquisitions; Will It Die By An Acquisition? | Lawson Software Expands Vertically As Well | Great Plains’ Latest Product Offering Ready to Stampede the SME Market? | Great Plains' eEnterprise Solution 'N Sync with Microsoft's New Platforms | Navision Executes At a Slower Pace | Symix Systems Front-Steps Into Greener e-Commerce Pastures | Has SAP Found Magic Formula (One) To Learn The Ropes Of Marketing? | Is Baan Showing Signs of Life After Death? | Oracle – How to Disappoint Analysts by Doubling Profits | Ross Systems Ends Year On a Sour Note and Braces Itself For Survivor’s Game | Will Oracle’s Freebie Shot Hurt (Or Only Graze) Siebel? | Great Plains – An SME Market Leader, But At What Cost? | IFS Marches On, Although With a String of Losses | Siebel: Great Plans for Great Plains | Commerce One Holds Announcement Festival | Fourth Shift Corporation: Working Overtime To Provide Complete Customer Care | SynQuest Posts Mixed Results | J.D. Edwards’ Mixed Blessings | QAD Continues to Wade Through Red Ink | eConnections Expands Web With IPNet | Geac Trying Its Luck in Partnering | Ultimate Connection Seeking Its US Retail Connection Through Solomon Software Partners | New Release For Ariba’s Software | Thru-Put Announces Features For New APS Release | Oracle Applications - An Internet-Reinvented Feisty Challenger | American Software Has Been Starving While Delivering Innovations | Intentia Has Been Bleeding For Its Platform Independence | ERP Belle Époque Officially Ended With the Demise of Baan and SSA | PowerCerv Facing Another Stormy Season | The Pros and Cons of Collaborative Planning | MAPICS Back On Track, But Not Without Restructuring Pains | Global Vendor Negotiation Strategies | Winner Takes All – Siebel Ousts SalesLogix From Solomon’s Deal | PeopleSoft 8 Launched – Anything to Write Home About? | PeopleSoft: No More a Humble Kid From a Rough Neighborhood? | IBM Nabs Another Application Vendor | Epicor Software Corp.: How Far From Being 'One-Stop' Shop? | SCT Comes Back With a Vengeance | Lawson Software Marches Over $300M Milestone | SAP Remains Solid While Transitioning | They Can Run, But You Can’t Hide | How Has Made2Manage Systems Been Managing Itself? | Baan Defectors – Is This Only Tip of an Iceberg? | Is Fourth Shift Succeeding in Providing 'Complete Customer Care'? | SAP - A Leader Under Reconstruction | How Detrimental Can a 2nd-In-Charge’s Departure Be? | Can Geac Reshuffle the ERP Standings? | ERP Getting a New Breath of Fresh Air in Europe | Has Market Been Too Harsh On Great Plains? | J.D. Edwards Chooses Freedom to Choose EAI | Siebel Has Done It Again – This Time with Navision | American Software - A Tacit Avant-Garde? | Ross Systems, Inc.: In Process of Renaissance | How Has MAPICS Been Extending? | PeopleSoft Manufacturing - This Time For Sure?! | i2 Technologies’ Latest Offering: J. D. Edwards OneWorld™ | SAP to Become Leaner, Meaner and More Organized | J. D. Edwards FOCUSes on Active Supply Chain | Infinium Software, Inc.: Having All the Right Cards? | Access Commerce Spices Up North American CRM Fray | No More Mr. Nice Guy With J.D. Edwards | Enterprise Resource Planning Systems Audio Conference | IFS Far Cry From Running Out of Breath | ROI Systems, Inc.: Will Slow and Steady Remain in the Race? | Baan Yet Another ERP Vendor to Find a Sanctuary Under Invensys’ Wing | MAPICS Red Ink Stained While Extending Its Offering | Intentia’s Growing Pains | Ross Systems’ Renaissance Yet to Happen | Epicor Continues To Bleed | Symix Systems’ Slips Into Red During Its E-Commerce Transition | Will Solomon Finally Satisfy Great Plains’ Insatiable Appetite? | Baan Sinks Deeper into Red Quicksand | Lawson Software’s CRM and ASP Moves – Wise, Bold, Injudicious, Enforced, or Something Else? | Is SAP Stumbling? Perhaps. | Yet Another ‘Big 5 ERP’ CEO Casualty | Navision Software a/s: Mid-market iNvasion | Essential ERP – Current Market Trends – Part II | Will That Wretched ERP Finally Die? Possibly, But Only the Acronym! | Yet Another ERP/CRM Partnership | Oracle Flying High on Q3 Report: Is Gold All That Glitters? | Navision Becoming More Visible | Geac Announces Q3 Results and Acquires CRM Vendor | ERP Demand Being Re-heated | ERP Vendors Venturing into PSA | Solomon Software: Breaking Away from Perception as “Best-of-Breed-Accounting” Vendor | JD Edwards’ Alliances: Is It Too Much of a Good Thing? | GLOVIA to be Resuscitated (Hopefully) | JD Edwards Reports Strong License Revenue Growth in Q1 2000, but… | Intentia Attempts to Become ‘Lean and Mean’ | Vendors Begin to Round Out Their CRM Suites | J.D. Edwards Names SynQuest Preferred Solution | Oracle Integrates Front and Back Office with Applications 11i | PeopleSoft's CEO Steps Down | SSA Seeks Support from Synquest | SAP sets up Apparel and Footwear team | Geac and JBA Join Forces to Form New ERP Giant | Computer Associates, Baan Japan and EXE Announce Strategic Alliance to Provide Total Supply Chain Management Solutions | Oracle to Enlist BPA Systems in its Mid-Market Quest | SAP Lowers Revenue Expectations | Symix Maintains Consistent Profitability Despite Y2K Market Conditions | Software Leasing Trend Slams Baan Earnings | Intentia Americas Gains Momentum with 10 New Deals Inked During Last Two Weeks | MAPICS Reports Solid Profitability Despite Dismal Fiscal 1999 4% Growth | Baan Releases New Supply Chain Products | French Government awards ERP contract to Peoplesoft | Business Software Firms Sued Over Implementation - Lawsuits Bring ERP Problems to Light | Geac Metamorphosises JBA Into Gear, but Cuts 20% of Staff | J.D. Edwards Incurs Further Losses In Third Quarter | Intentia and Dash Associates Team Up | Key Product Delays Take a Toll on Oracle Users | ERP Packages For Midsize Firms in the Works | QAD Reports Third-Quarter--Revenue Rises 56 Percent | Pronto ERP 'Coming to America' | System Software Associates Announces Fiscal Fourth Quarter Results - The Agony Continues | Boeing Expands Baan Licensing Deal | Oracle Reports Strong Profits | QAD Offers Improved E-Commerce Applications with Greater Flexibility and Customization Capabilities | Heads Roll at Consulting Giant in Wake of SEC Investigation | Is Baan Clinically Dead? | Manhattan Associates Partners with Intentia | PeopleSoft Completes Acquisition of Vantive; Vantive CRM Applications Integrate with PeopleSoft and Other ERP Systems | SAP, PeopleSoft Earnings Look Brighter; ERP Strikes Back | Great Plains on a Shopping Spree | Geac Upgrades Accounting And Human-Resources Apps -- SQL Release 6.0 Simplifies Purchasing And HR Services For Midsize Companies | MAPICS, Inc. to Acquire Pivotpoint, Expanding e-business Offerings for Mid-Sized Manufacturing Establishments | PeopleSoft Takes Aim at Foods Industry | ERP Vendors Moving to Aerospace and Defense Markets | PeopleSoft Recuperating Slowly, Hoping to Sink 1999 into Oblivion Quickly | Baan Posts $236 Million Loss and Sells Off Coda for Nearly $40M Less Than It Paid | Symix Expands Its Product Offering While Remaining Profitable | IFS Continues to Blossom | SAP Declares Victory Over Manugistics, Takes Aim at i2 | Food Producer Files $20m Lawsuit Against Oracle | Oracle Loses Again | PeopleSoft Programs Cause Headaches at Number of Universities | Hummingbird Announces Extraction and Portal Strategy for ERP | SAP Posts Solid Q499, but Warns of Q100 | Analysis of Lawson Delivering New Retail Analytic Capabilities | ERP Vendor Lawson Software Extends to IBM's DB2 Universal Database | J.D. Edwards Teams with FRx Software to Improve Reporting Solutions | SAP and HP on the Web Together | Analysis of SAS Institute and IBM Intelligence Alliance | E-Commerce Lesson: Success Gets a Yawn, Failure Takes a Beating | SAP's New Level of e-Commerce: mySAP.com | BAAN Announces "Open World": Business-To-Business Collaboration Over The Internet | Lawson Plays Well With Others | The "S" in SAP Doesn't Stand for Security (that goes for PeopleSoft too) | Oracle Co. - Internet Paradigm Boosts Applications Growth | J.D. Edwards and Numetrix Ponder the Future as One | Symix Sytems: Shifting SME's Focus to Their Customers | MAPICS: Will Customer Satisfaction be Enough? | Intentia: Java Evolution From AS/400 | SSA: Evolving into systems integrator to survive | JBA: Will it remain "@ctive Enterprise"? | Marcam Solutions: Shifting its Focus to MES | Industrial & Financial Systems, IFS AB: Thriving on Product Flexibility and Incremental Deployability | Enterprise Resources Planning (ERP) Market - Dismal 1999, the New Millennium to bring Relief (for Some) | Lawson Software: Self-Evidently Thriving on Innovations | QAD Inc.: The Art of Vertical Focus | Great Plains: Strong Channel and Microsoft focus for Dynamic(s) Growth | SAP's Dr. Peter Barth on Client/Server and Database Issues with SAP R/3 | Baan E-Commerce: a Wing, a Prayer & a Single Platform | J.D. Edwards - Creating OneWorld of Mid-sized ERP Users | Q: Who Wants to Marry a Multi-Billionaire? A: Baan -- Foster Care for Its Orphans Needed As Well | Geac Computer Corporation: Mastering Growth by Acquisitions |