Case Study: Increasing Productivity with Advanced Planning and Scheduling

  • Source: Quintiq
  • Written By:
  • Published:
  • (Originally Published On:) )
Helsinki (Finland)-based Rautaruukki Oyj is a leading supplier of metal-based components, systems, and integrated systems to the construction and mechanical engineering industries. The company has a wide portfolio of metal products and services, with operations in over 20 countries. Find out how the company found a solution to manage inventory, manufacturing productivity, and delivery performance.

Featured Software Research:

Software Usability Challenge for Electric Power Industry

  • Source: IFS
  • Written By:
  • Published:
Enterprise Resource Planning (ERP)/Enterprise Asset Management (EAM) usability is a challenge for the electric energy industry according to a study conducted for IFS North America. This paper outlines study results of 100 electric energy industry executives and offers advice for selecting ERP and EAM for maximum usability. ERP and EAM with enhanced usability increases productivity and system usage, maximizing value realized. Read More

Dynamic Scheduling: The Missing Link to Mastering Field Mobility?

Source Refrigeration & HVAC needed an automated scheduling solution to round out its mobile initiative for a workforce of nearly 500 field technicians. Ease of integration was a key consideration for Source. Find out why the company found IFS 360 Scheduling's dynamic solution appealing. Read More

You may also be interested in these related documents:

BMR Tones Up Sales Performance with Advanced Analytics

  • Source: IBM
  • Written By:
  • Published:
Bio Medical Research (BMR) was replacing its core enterprise resource planning (ERP) solution, and saw this as an opportunity to enhance its business analytics capabilities. And as a midsized business, BMR wanted to find an affordable solution that would offer enterprise-class functionality. Download this case study to learn about the way IBM Cognos Express helped BMR tone up its sales performance with advanced analytics. Read More

Case study: Mitsubishi Heavy Industries, Ltd.

At Nagoya Guidance and Propulsion Systems (NGPS), more than half of production time goes into to products such as aircraft guidance systems. In 2003, NGPS installed Asprova’s advanced planning and scheduling system for greater efficiency from the planning it had been doing manually until that time. In 2007, NGPS added the sales module for more uniform production planning. Learn more about the efficiencies NGPS gained. Read More

Planning and Scheduling in the 21st Century

  • Source: Infor
  • Written By:
  • Published:
For many manufacturers, the demands of meeting customer expectations and reducing production costs in an environment of more products and more choice places stress on the effectiveness of planning and scheduling processes. Yet, systems are becoming outdated, lacking the flexibility and responsiveness to manage complex production environments. Find out about planning and scheduling options and how to boost productivity. Read More
 
comments powered by Disqus