TEC RSS 网站地图
 
 
Technology Evaluation Centers
搜索TEC        高级搜索
POWERED BY
文章概要
 

ERP Systems and the ETO Manufacturing Market
Part Two: ETO versus Repetitive Differences

P.J. Jakovljevic - May 4, 2004

ETO versus Repetitive Differences

Having outlined the above, it might be useful for us to recap the major differences between engineer-to-order (ETO) and repetitive/volume-base manufacturing environments throughout different phases of a product life cycle as well within various functional departments within a manufacturing organization. First of all, prior to any manufacturing, there is extensive work in the product definition phase (i.e. estimation, design, and engineering) before anything can be made, bought or delivered. However, the major difference is that within ETO companies the product design is an integral part of production (if not even afterwards, during the site installation and commissioning), whereas for repetitive, standard items the design is typically completed and handed "over the wall" to the manufacturing well before the production starts...


 
登录名:
密码:
 
忘记您的密码?
新用户? 注册 免费!
 

注意
必须接受Cookies才能浏览本站。

如果您无法登录,请检查您的浏览器中cookies的设置或您的个人防火墙设置,并确认这些设置没有禁用全部cookies。

 
Recent Searches:
A

A Parts: 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1
 
B

B Parts: 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1
 
C

C Parts: 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1
 
D

D Parts: 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1
 
E

E Parts: 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1
 
F

F Parts: 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1
 
G

G Parts: 3 | 2 | 1
 
H

H Parts: 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1
 
I

I Parts: 7 | 6 | 5 | 4 | 3 | 2 | 1
 
J

J Parts: 3 | 2 | 1
 
K

K Parts: 2 | 1
 
L

L Parts: 7 | 6 | 5 | 4 | 3 | 2 | 1
 
M

M Parts: 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1
 
N

N Parts: 4 | 3 | 2 | 1
 
O

O Parts: 6 | 5 | 4 | 3 | 2 | 1
 
P

P Parts: 5 | 4 | 3 | 2 | 1
 
Q

Q Parts: 1
 
R

R Parts: 5 | 4 | 3 | 2 | 1
 
S

S Parts: 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1
 
T

T Parts: 3 | 2 | 1
 
U

U Parts: 1
 
V

V Parts: 1
 
W

W Parts: 3 | 2 | 1
 
X

X Parts: 1
 
Y

Y Parts: 1
 
Z

Z Parts: 1
 
Others

Other Parts: 1
 
RFP模板相关资源: 离散型制造业ERP功能需求分析模板 | 流程型制造业ERP功能需求分析模板
TEC: Technology Evaluation Centers

关于TEC | 联系我们 | 媒体合作伙伴 | 隐私政策 | 专栏作者 | English | 中文 | 日本語 | Español | Français

© 2008 Technology Evaluation Centers Inc.
版权所有。 未经书面许可,严禁转载或引用。UID: 116

61894.19